Site Preparation
1-5
Electrical Requirements
Power Requirements
The kiosk's main power supply has a maximum output of 150 Watts and provides power
to the kiosk and its powered peripherals.
Range
Nominal
Vrms
Minimum
Vrms
Maximum
Vrms
Input Current
Maximum Arms
Low (115)
100 - 127
90
136
2.2 A
High (230)
200 - 240
180
265
1.2 A
AC Wiring Requirements
The customer must provide suitable AC power for the NCR TouchPort 120 (2368) Kiosk
and any associated equipment and devices. NCR recommends a dedicated unswitched
power line dedicated to the NCR equipment installation. Refer to the
and Peripherals AC Wiring Guide
for store AC wiring requirements. The AC outlet must
be installed near the kiosk and easily accessible to the operator.
Summary of Contents for TouchPort 120
Page 1: ...Site Preparation Guide NCR TouchPort 120 2368 Kiosk Release 1 2 BCC5 0000 5049 Issue D...
Page 15: ...1 6 Site Preparation Kiosk Dimensions Countertop...
Page 16: ...Site Preparation 1 7 Global Pedestal Global Pedestal R1 2...
Page 17: ...1 8 Site Preparation...
Page 19: ...1 10 Site Preparation Global Pedestal Base Plates...
Page 20: ...Site Preparation 1 11...
Page 21: ...1 12 Site Preparation Global Pedestal R1 2 Base Plates...
Page 22: ...Site Preparation 1 13...
Page 23: ...1 14 Site Preparation No Base Plate...
Page 24: ...Site Preparation 1 15 Millwork NCR Millwork...