background image

10

NCR RealPOS 25 Terminal Site Preparation

NCR 5976 2x20 LCD Dimensions

Summary of Contents for RealPOS 25

Page 1: ...SITE PREPARATION GUIDE NCR RealPOS 25 7610 POS Release 2 0 B005 0000 2018 Issue C...

Page 2: ...erms and conditions of an agreement you have with NCR NCR s copyright notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components software and firm...

Page 3: ...viceable parts Servicing should only be performed by a qualified service technician Fuse Replacement Warning For continued protection against risk of fire replace only with the same type and ratings o...

Page 4: ...must be plugged into a matching outlet that is properly installed and grounded in accordance with all local codes and ordinances Do not modify the plug provided if it will not fit the outlet have the...

Page 5: ...sh Wall Mount Dimensions 7 VESA Mounting Hole Dimentions 8 NCR 5943 LCD 5967 12 Inch Touch LCD Dimensions 9 5943 LCD 5967 15 Inch Touch LCD Dimensions 9 NCR 5976 2x20 LCD Dimensions 10 Tall Pole Mount...

Page 6: ...ents 20 Airflow Requirements 21 Electrical Requirements 22 7610 Terminal Power Requirements 22 Peripheral Power Requirements 22 AC Store Wiring Requirements 22 Cable Routing 23 Customer Display Config...

Page 7: ...ications prior to installing an NCR RealPOS 25 terminal also referred to as the NCR 7610 Prepare the site properly before installing the terminal because site preparation deficiencies may be difficult...

Page 8: ...ssociated hardware Provide and install necessary power distribution boxes conduits grounds lightning protection devices and associated hardware Ensure all applicable codes regulations and laws includi...

Page 9: ...hrough their power cords If the peripheral is powered by the terminal and has no dedicated ground then all of the ESD energy is coupled into the port connection Some devices may require the use of an...

Page 10: ...the temperature changes beyond the restrictions Temperature Parameter Restriction Operating 5 C to 40 C 41 F to 104 F dry bulb Storage 10 C to 50 C 14 F to 122 F three months Shipping 40 C to 60 C 40...

Page 11: ...NCR RealPOS 25 Terminal Site Preparation 5 Dimensions Terminal w MSR...

Page 12: ...6 NCR RealPOS 25 Terminal Site Preparation Terminal and Table Top Stand Dimensions Terminal and Table Top Stand w Power Supply Enclosure...

Page 13: ...ration 7 Terminal w Customer Display Dimensions 7409 K502 Flush Wall Mount Dimensions Note The Terminal Cable Cover cannot be fully opened when using the Flush Wall Mount but can be easily removed to...

Page 14: ...Dimentions Third Party Mounts can be designed for the 7610 Display Head The back panel of the 7610 has VESA compliant screw holes M4 that are to be used for this purpose The M4 screws should not exce...

Page 15: ...NCR RealPOS 25 Terminal Site Preparation 9 NCR 5943 LCD 5967 12 Inch Touch LCD Dimensions 5943 LCD 5967 15 Inch Touch LCD Dimensions...

Page 16: ...10 NCR RealPOS 25 Terminal Site Preparation NCR 5976 2x20 LCD Dimensions...

Page 17: ...Terminal Site Preparation 11 Tall Pole Mount There are four different length posts available for the 5976 display in four inch increments Note Heights greater than 215 mm 8 5 in should be screwed to t...

Page 18: ...12 NCR RealPOS 25 Terminal Site Preparation Base Plate Mounting Hole Dimensions NCR 5982 6 5 Inch LCD Dimensions...

Page 19: ...NCR RealPOS 25 Terminal Site Preparation 13 Power Supply Dimensions Power Supply Bracket...

Page 20: ...14 NCR RealPOS 25 Terminal Site Preparation NCR 5932 5xxx USB Big Ticket POS Keyboard Dimensions 5932 65xx PS 2 Compact Keyboard Dimensions...

Page 21: ...NCR RealPOS 25 Terminal Site Preparation 15 NCR 5932 66xx USB Compact Keyboard Dimensions NCR 7167 Printer Dimensions...

Page 22: ...16 NCR RealPOS 25 Terminal Site Preparation NCR 7168 Printer Dimensions NCR 7197 Thermal Receipt Printer Dimensions...

Page 23: ...NCR RealPOS 25 Terminal Site Preparation 17 NCR 7198 Thermal Receipt Printer Dimensions NCR 2181 Cash Drawer Dimensions...

Page 24: ...18 NCR RealPOS 25 Terminal Site Preparation NCR 2183 Compact Cash Drawer Dimensions NCR 2185 Flip Top Drawer Dimensions...

Page 25: ...l 6 1 13 5 2181 Cash drawer 6 0 13 3 2185 Cash Drawer 12 3 27 0 2186 Cash drawer 12 3 27 0 5943 12 1 LCD 2 1 4 8 5943 15 LCD 2 8 6 2 5967 12 Touch LCD 4 0 8 8 5966 15 Touch LCD 3 6 7 2 7167 Receipt Im...

Page 26: ...e provides an example Terminal Component kg lbs Base unit 6 1 13 5 5943 15 Inch LCD 2 8 6 2 5972 Customer Display 0 7 1 5 64 Key keyboard 0 9 1 9 7167 Receipt Impact Printer 4 5 10 0 Total 11 4 25 1 M...

Page 27: ...oling Do not place the terminal in an enclosed area where sufficient ventilation is not available Leave at least 100 mm 4 inches of clearance on sides where air vents are located When the terminal is...

Page 28: ...cific power cord must be ordered separately Available NCR power cords are described in the System Cables section Peripheral Power Requirements The number of peripherals that the terminal can support i...

Page 29: ...Site Preparation 23 Cable Routing Peripheral cable connectors are located inside the Terminal Cable Cover on the bottom of the terminal The cables are routed out the opening in this cover and down thr...

Page 30: ...24 NCR RealPOS 25 Terminal Site Preparation 1 Remove the Stand Cable Cover by pressing the button detents on the sides of the cover and then pivoting the top away from the stand...

Page 31: ...through the Cable Strain Relief and over the Cable Guide as shown below 3 Replace the Stand Cable Cover Customer Display Configuration If configured with a Customer Display the cables are routed from...

Page 32: ...on Custom Enclosures The 7610 can be installed in customer provided custom enclosures where the 7610 is face mounted inside the enclosure Mount the 7610 in the enclosure using screws of the proper len...

Page 33: ...NCR RealPOS 25 Terminal Site Preparation 27 Use the dimensioned illustration below for reference when designing the custom enclosure...

Page 34: ...28...

Page 35: ...ty problems are is not covered by the NCR Maintenance Agreement NCR accepts no liability for any such occurrence nor for its consequences When power transient suppression is required the suppressors u...

Page 36: ...downtime and extend the life of the RealPOS Retail Solution For sizing and product information please call NCR Site Preparation Services at 800 257 0458 The following product offerings are available...

Reviews: