
Non-Scale 2-Bag Bagwell Upgrade
33
2. Unplug the AC Power Out and AC Power In cables from the Power Strip. AC Power
In Cable will be reused in the new Bagwell. AC Power Out Cable should be routed
either through the left-hand or right-hand lower Core access cutout into the new
Bagwell.
Note:
The Power Strip remains on the rear Core wall but not reused.
3. Finish routing the cables into the Bagwell. For more information, refer to
Summary of Contents for FastLane SelfServ Checkout 7358
Page 1: ...Kit Instructions Non Scale 2 Bag Bagwell Upgrade 7358 K122 K145 Issue B...
Page 3: ...iii Revision Record Issue Date Remarks A Jul 2020 First Issue B Nov 2021 Updated Kit Contents...
Page 4: ...iv...
Page 10: ...6 Non Scale 2 Bag Bagwell Upgrade 7358 K145 Non Scale 2 Bag Bagwell Upgrade Walmart Light Blue...