background image

2

7761-K182 (USB Dual RJ12 Expansion)

Installation Procedure

1. Install the Expansion Funnel and Standoffs (4) into the rear of the Ebox.

Caution:

Always use a soft material (cloth, foam) to protect the display screen when

placing the terminal face down.

2. Install the I/O Plate to the Expansion Board and secure with screws (2).

Reviews: