NCR 7360-K509 Kit Instructions Download Page 6

7360-K509 Basket Over Bagrack

3

2. Align the Slide Rail with Carriage Assembly on the studs of the Slide Bracket and

secure with six (6) serrated lock nuts.

Note:

The studs can be accessed by sliding the Carriage along the Slide Rail.

3. Install the Shelf Bracket and Hinge Assembly on the Carriage (4 screws).

Summary of Contents for 7360-K509

Page 1: ...Kit Instructions Basket Over Bagrack 7360 K509 Issue B...

Page 2: ...under the terms and conditions of an agreement you have with NCR NCR s copyright notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components softw...

Page 3: ...i Revision Record Issue Date Remarks A Mar 2017 First issue B Jun 2017 Updated IP PDF template...

Page 4: ...Basket Over Bagrack This kit contains the components to add a Basket Shelf to the NCR FastLane SelfServ Checkout 7360 This kit can be used with a Bagrack Kit Contents...

Page 5: ...ion Procedure 1 Install the Slide Bracket on the Core 7 screws Note If some mounting holes are inaccessible remove the color panel and drill 9 mm holes through the cross marks shown below The cross ma...

Page 6: ...Rail with Carriage Assembly on the studs of the Slide Bracket and secure with six 6 serrated lock nuts Note The studs can be accessed by sliding the Carriage along the Slide Rail 3 Install the Shelf B...

Page 7: ...t and Hinge Assembly to end of the Slide Rail that is farthest from the front of the Core b Partially thread screws on the two upper holes of the Hinge c Align the Shelf Assembly key holes over the pa...

Page 8: ...the lower holes to secure the Shelf Assembly on the Hinge e If the NCR Fastlane SelfServ Checkout 7360 unit s orientation is converted from self checkout mode to assisted service mode slightly lift t...

Page 9: ...6 7360 K509 Basket Over Bagrack 5 Install the Bagrack in front of the Shelf...

Reviews: