1-30
7350 2-Bag Bagwell Upgrade
5. If not already present, partially thread the two (2) upper screws on the Bagwell side
of the Core. Leave approximately ¼ inch of the threads exposed.
6. Mate the new Bagwell to the Core by lifting the frame up and over the partially
threaded screws.
Note:
Ensure that the two frontmost key holes on the Bagwell are used.
Summary of Contents for 7350-K140
Page 1: ...Kit Instructions 2 Bag Bagwell Upgrade 7350 K140 K141 K142 K143 K145 K964 Issue C...
Page 4: ...1 4...
Page 52: ...1 48...