
Planning requirements.
If you are thinking of making any changes to your property, including installing a
form of renewable energy, you must apply to the Building Control Office at your
local council for approval.
Planning permission may or may not be required, depending on such factors as:
location, individual planning department, nature of scheme, neighbors' opinions,
visual impact and proximity to public through roads.
Before beginning any work we recommend that you contact your local planning
department to determine whether planning permission is required.
Building regulations.
- Any installation of a heating appliance, or modification to a chimney such as
relining, has to be carried out in accordance with. Building Regulations – Republic
of Ireland Part F – Ventilation Part J – Heat Producing Appliances (Article 41 in
N.Ireland Part J in England and Wales and F in Scotland). Building Control
Consent might also be needed for such work unless the work is carried out by a
qualified person as stated below. We recommend that all installation or design is
completed in accordance with British Standards, including BS 5410 , BS 4543, BS
4876, BS 1181 and BS 715.
Installer expertise.
All installation work should be undertaken by a person who is a member of an
approved competent person scheme as outlined in the
COMPETENT PERSON
SELF-CERTIFICATION SCHEMES IN 2003
which can be found at.
http://www.odpm.gov.uk/index.asp?id=1131139
All appliances must be commissioned and failure to do so will
invalidate the
boiler/burner warranty.
Page 2
Summary of Contents for Opop 4120
Page 1: ...Scotte Opop Installation and operating Manual 16 24 30kw NORDIC BIO ENERGY LTD Pellets Systems...
Page 5: ...Dimensions of burner and wiring diagram Page 4...
Page 16: ...Page 14...
Page 18: ......
Page 19: ...Quick Start 16kw NBE Pellets Systems Estimating Table...
Page 20: ...Quick Start NBE Pellets Systems Estimating Table...
Page 21: ......
Page 22: ...Quick Start NBE Pellets Systems Estimating Table...