background image

 83.07 

 164.57 

MEASURE THE WIDTH AND DEPTH

OF THE SHELTER TO CHECK 

CORRECT ALIGNMENT.

Please note 1.5" Tec Screws 

are for roof panels only

CB1

CB1

JF1

CB1

CB1

CB1

JF1

JF1

CB1

CB1

JF1

P1

P1

ST3

JF1

JF1

JFT

JF1

JF1

CB1

ENSURE CORRECT 

ALIGNMENT ON 

CORNERS

JF1

CB1

CB1

CB1

CB1

JF1

JF1

JF1

JFT

DETAIL A

SCALE 1 : 10

DETAIL B

SCALE 1 : 10

DETAIL C

SCALE 1 : 10

DETAIL D

SCALE 1 : 10

JF1

CB1

JF1

CB1

Step 1

 

Assemble 

S1

 frames to make up the main structure using 

CB1

 

               brackets for the corners and 

JF1

 brackets for the straight joints.

               Attach 

P1

 post to the 

S1

 Frame using 

CB1 

and

 JF1 

brackets.

               Brackets as shown below.

Assemble the 

ST3

 Roof ties and the 

P5

 Post using the 

JFT

 and 

JF1

 

brackets.

5

Summary of Contents for SR8300

Page 1: ...Assembly Instructions Shelter Type SR8300 SR8300 01 29102021 USA...

Page 2: ...13 10 10 11 1 4 4 11 9 13 2 8 16 17 5 7 15 11 13 13 1 5 6 6 8 3 2 11 15 13 13 2 EXPLODED VIEW...

Page 3: ...2 7 JFT Bracket 8 66 x 5 9 1 8 DR Rafter Bracket 4 3 x 1 6 x 2 16 9 DR2R DR2R Rafter 92 32 5 10 DR2I DR2 infill panel 85 x 15 75 2 11 DR2PO DR2 Roof Panel Outer 92 32 x 41 54 2 11 DR2PI DR2 Roof Pane...

Page 4: ...ed Drill Screwdriver Mallet 17mm Wrench T25 Torx bit Fittings Bolt set M10 T25 T38 BTANCM12100 M10 x 60mm Nut Washer 1 Tech screw 1 5 Tech screw Black Caps M10 12 x 100 mm Concrete Bolt Pack A B 33 33...

Page 5: ...NT ON CORNERS JF1 CB1 CB1 CB1 CB1 JF1 JF1 JF1 JFT DETAIL A SCALE 1 10 DETAIL B SCALE 1 10 DETAIL C SCALE 1 10 DETAIL D SCALE 1 10 JF1 CB1 JF1 CB1 Step 1 Assemble S1 frames to make up the main structur...

Page 6: ...2R DR2R DR2R 40 75 40 75 40 75 40 75 RAFTER PLACEMENT 6 Step 2 Attach DR2R rafters using DR brackets Secure the END PANELS DR2I to frames using 1 tech screws The end rafters need to be placed in posit...

Page 7: ...T DRATI DR2PI 7 Step 3 Attach the DR2PO and DR2PI Panels to the top of the rafters with the DR2PO on either end and the DR2PI in between Seal the gap between the panels using the DR2T strips Attach th...

Page 8: ...FT1 x5 FT3 x4 8 Step 4 Move the shelter into its desired position and attach the foot brackets FT1 FT3 before fixng in place...

Page 9: ...40 75 39 17 41 12 38 27 77 44 40 75 40 75 41 12 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 8 oversized on all 4 sides 9...

Page 10: ...anels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched CONTACT DETAILS Email Sales nobutts com Web www nobutts...

Reviews: