![NBB SR8063 Assembly Instructions Manual Download Page 9](http://html1.mh-extra.com/html/nbb/sr8063/sr8063_assembly-instructions-manual_3654258009.webp)
AR2POA
AR2TS
FT3
AR2TS
AR2TS
AR2TS
AR2POA
AR2POI
AR2POA
AR2POA
AR2POI
FT3
FT1
FT1
FT1
FT3
AR2CUTO
AR2CUTO
AR2CUTI
Align the outer roof panels
AR2POA
with the outer edges of the shelter and
space the
AR2POI
panels central. Use the
AR2TS
strips to seal the gap
between the roof panels and cap off the top with the
AR2CUTO/AR2CUTI.
Once the shelter is in the final position it can be secured to the ground
using
FT3
and
FT1
brackets and the concrete bolts.
9
Step 5