background image

AN ( 1 : 6 )

AP ( 1 : 6 )

AN

AP

ELEMENTS

QUANTITY

NUMBER

Board L=1280

9

1

Screw 6x30

36

2

1

1

2

2

3

3

4

4

5

5

6

6

A

A

B

B

C

C

D

D

Assembly - step by step

ARRET Sp. z o.o.

user

2013-05-17

 

Design

Date

14 / 15 

Version

Page

Date

2

1

1

1

1

Shelter - HILTON

Summary of Contents for Hilton NUB012

Page 1: ...HS 01 06092016 NBB Email sales nobutts co uk Tel 0800 1777 052 Hilton Assembly Instructions Shelter type NUB012 013 014 NU...

Page 2: ...Page Date 4 2 3 1 2 3 ATTENTION 1 Left sidewall of the shelter assembling to the bottom beam Assembly step by step NUMBER QUANTITY ELEMENTS 1 1 Foundation plate 3 1 Bottom beam type 205 4 2 Bolt M10x...

Page 3: ...lt M10x30 with nest to the hex key 2 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 2 15 Version Page Date 1 2 1 Shelter HILTON 1 1 Hilton t...

Page 4: ...om beam type 200 1 1 Smoking shelter pillar 1 2 Bolt M10x30 with nest to the hex key 4 3 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 3 15 V...

Page 5: ...t to the hex key 4 2 Pad 10 5 4 3 F J 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 4 15 Version Page Date 1 1 2 3 3 2 2 3 1 Assembly hole fo...

Page 6: ...UANTITY NUMBER Middle pillar 2 1 Bolt M10x30 with nest to the hex key 4 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 5 15 Version Page Dat...

Page 7: ...o user 2013 05 17 Design Date 6 15 Version Page Date ATTENTION 1 Assembling front roof beam on bottom hole view K 2 Then put the bow shaped handle on assembly connector of roof beams view L 3 After i...

Page 8: ...S QUANTITY NUMBER Middle pillar 1 1 Bolt M10x30 with nest to the hex key 3 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 7 15 Version Page...

Page 9: ...80 2 1 Screw 5 5x16 10 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 8 15 Version Page Date 2 1 2 1 ATTENTION 1 To screw the bow shaped han...

Page 10: ...quare of fixing polycarbonate 45x20x1 5 L 1355 2 4 Try square of fixing polycarbonate 45x20x1 5 L 1525 4 5 Screw 6 3x25 20 6 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o...

Page 11: ...he bench 3 2 Right support of the bench 3 3 Screw M8x20 4 4 Pad 8 4 12 5 Screw M8x60 4 6 Nut M8 4 7 Rivet 4 8x10 12 8 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user...

Page 12: ...LEMENTS QUANTITY NUMBER Board L 1280 3 1 Screw 6x30 12 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 11 15 Version Page Date 2 1 1 1 1 Shel...

Page 13: ...1 Rivet 4 8x10 54 2 AE 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 12 15 Version Page Date 2 1 2 ATTENTION 1 Different setting of fixing g...

Page 14: ...AK 1 5 AL 1 5 AM 1 5 AF AG AH AJ AK AL AM 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 13 15 Version Page Date 1 2 3 4 4a 4b x2 x6 x6 x6 Gla...

Page 15: ...AP ELEMENTS QUANTITY NUMBER Board L 1280 9 1 Screw 6x30 36 2 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 14 15 Version Page Date 2 1 1 1 1...

Page 16: ...R 1 6 AR ELEMENTS QUANTITY NUMBER Cover of the hole 8 1 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D Assembly step by step ARRET Sp z o o user 2013 05 17 Design Date 15 15 Version Page Date 1 Shelter HILTO...

Page 17: ...Variances...

Page 18: ...Notes...

Page 19: ...Notes...

Page 20: ...e Road Poole Dorset BH15 2AF THANK YOU FOR PURCHASING THIS PRODUCT MAINTENANCE To ensure your products give you many years of use we recommend that you Clean panels regularly with soapy water Ensure a...

Reviews: