
Gas Water Heater Installation
56
█
Factory Setting of Dip Switch:
█
Completing the Install:
If you answered “yes” to all of the questions in the above checklist, your
install is now complete. If you answered “no” to any of the points in the
checklist, please review the installation and operation manuals to confirm
your installation.
For any troubleshooting issue, see the “Error Codes”
section of the Owner
’s Operation Manual. For any questions or problems
during the installation, contact Navien’s technical department toll-free at 1-
800-519-8794 (714-258-9005) or visit the technical support section of the
website at:
•
www.navienamerica.com
COMPLETING
THE
INSTALL
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-180 NG
Dip Switch 1
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-180 LP
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
Dip Switch 1
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-180A NG
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-180A LP
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-210 NG
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-210 LP
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-240 NG
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-240 LP
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
1
2
3
4
5
6
ON
1
2
3
4
5
6
ON
7
8
NR-210A NG
NR-210A LP
NR-240A NG
NR-240A LP
NP-180 NG
NP-180 LP
NP-180A NG
NP-180A LP
NP-210 NG
NP-210 LP
NP-240 NG
NP-240 LP
NP-210A NG
NP-210A LP
NP-240A NG
NP-240A LP