CONTACT US TODAY AT
E.
W.
NAVCO.US
P.
832.467.3636
F.
832.467.3800
A.
11929 Brittmoore Park Dr.
Houston, TX 77041
Vibration Technology for Processing Bulk Materials
NATIONAL AIR
VIBRATOR CO.
®
Page 10
Typical Air Control Package Arrangement
Mounting Instructions: T-Slot Mount
1. Determine proper mounting location. Assure a
mounting angle greater than 20°, unless ‘SP’ type.
2. Skip weld reinforcing plate to hopper. Do not weld
corners. NAVCO can recommend weld specifications if
required.
3. Skip weld t-slot to reinforcing plate. Do not weld
corners. NAVCO can recommend weld specifications if
required.
4. Insert bolts in slots and position vibrator onto t-slot.
5. Install lock washer (if included) and nut. Torque
mounting hardware to recommended specification
(see torque table at beginning of Section 3).
6. Re-torque mounting hardware after 24 hours of
equipment operation.