background image

19

Nautilus® Pro Series Elliptical Assembly Manual

Step 12: Install Pivot Covers and End Caps

ASSEMBLY PROCESS

12-1 Use (8) 15mm Phillips Head Screws (Ref #6) to install the Left and Right Upright Caps (#32).

12-2 Use (8) 10mm Phillips Head Screws (Ref #34) to install the Left and Right Front Pivot Covers (#35).

12-3 Use (2) 15mm Machine Screws (Ref #37) to install the Left and Right Stabilizer End Caps (#36).

NOTE:

 Insure that the 15mm Machine Screws (Ref #37) are used in Step 12-3 or  a clicking noise will result.

NOTE:

  Right and left side covers are interchangeable.  

One side of machine will use one screw on the 

outside of the cover and three on the inside, while 

the other side will have  three on the outside and 

one on the inside.

Summary of Contents for EV7.16

Page 1: ...Model EV716 EV718 P N 000 3603 Rev D 5 05 2007 Assembly Manual Pro Series Elliptical EV718 model EV716 model...

Page 2: ...ety information installation requirements and operating instructions electrical shock hazard or other serious injury Failure to follow the conditions set forth below shall limit to the extent allowed...

Page 3: ...ontents Item Number Item Description Quantity 1 20mm Allen Head Bolt 4 2 1 2 Spring Washer 4 6 15mm Phillips Head Screw 36 10 70mm Hex Head Bolt 2 11 8mm Washer 4 12 M8 Locking Nut 2 14 M10 x 65mm All...

Page 4: ...ad Bolt 1 20mm Allen Head Bolt 2 1 2 Spring Washer 6 15mm Phillips Head Screw 10 70mm Hex Head Bolt 11 8mm Washer 12 M8 Locking Nut 34 10mm Phillips Head Screw 30 30mm Phillips Head Screw 28 M8 x 40mm...

Page 5: ...embly Manual reference chart Actual Size Hardware Reference Chart 39 35mm Pan Head Bolt 14 M10 x 65mm Allen Head Bolt 15 M10 Washer 1 6 M10 Locking Nut 25 M12 x 90mm Allen Head Bolt 37 15mm Machine Sc...

Page 6: ...r assembly and safe usage 600 kg cm 200 kg cm 500 kg cm 500 kg cm 500 kg cm 500 kg cm Front View TORQUE SPECIFICATIONS 4 4 4 4 4 2 15 2 5 4 Whenassemblingthe ev716 ev718 it is imperativethat you refer...

Page 7: ...g cm 500 kg cm 500 kg cm 500 kg cm Rear View Nautilus EV716 EV718 Torque Settings 4 4 4 4 4 2 15 2 5 4 Whenassemblingthe ev716 ev718 it is imperativethat you reference and use the torque settings LIST...

Page 8: ...the box lid and the styrofoam containing the unit covers Figures 1 2 1 3 Remove the outer box cover Figure 3 1 4 Use box knive to cut the shrink wrap on the left side of the unit and remove Console b...

Page 9: ...ly angle styrofoam downward and remove pull down outwards from around pod assembly and swing arm Figure 6 1 7 Remove the side pod assembly Figures 7 8 1 8 Repeat Steps 1 5 through 1 7 on the other sid...

Page 10: ...ef refers to the Hardward Reference Chart on pages 5 6 Tip Tilt the Base unit forward about an inch while inserting the Allen Bolts Base Unit Rear Frame IT IS HIGHLY RECOMMENDED THAT YOU DO NOT ATTEMP...

Page 11: ...7 and set aside 3 2 Use 2 70mm Hex Head Bolts Ref 10 4 M8 Washers Ref 11 and 2 M8 Locking Nuts Ref 12 to attach the left and right Side Rails 9 to the Base Unit 4 Leave hardware only hand tight NOTE T...

Page 12: ...y hand tight 4 2 Use 8 M12 x 70mm Allen Head Bolts Ref 13 to the Rear Frame 3 Tighten 6 M10 x 65mm Allen Head bolts from Step 4 1 used to attach the Left and right Support Uprights 13 to the Left and...

Page 13: ...8 Base Unit Linkage Cover Swing Arm Side Rail 6 1 Cut wire ties from the top of the swing arm prior to using 2 M12 x 100mm Allen Head Bolts Ref 19 and 2 M12 Locking Nuts ref 21 to attach the Left and...

Page 14: ...h the round opening in the front of the Pod Assembly 23 The Pod Assembly may rest on the ground before moving to Step 7 Do not yet install Right Side Pod Assembly 7 1 Use 5 15mm Phillips Head Screw Re...

Page 15: ...nnecting Arm Pivot 24 and torque to 36 ft lbs 8 2 Use 1 M12 x 100mm Allen Head Bolt Ref 19 and 1 M12 Locking Nut REf 21 to attach the Rear Connecting Arm Pivot 26 and torque to 36 ft lbs 8 3 Repeat St...

Page 16: ...that must plug into the base unit wire To avoid damage to the unit do not allow the arm to hang freely from the wiring assembly 9 2 Use 4 M8 x 40mm Allen Head Bolts Ref 28 and 4 M8 Spring Washers Ref...

Page 17: ...Arm connection is factory assembled use 2 Phillips screwdriver to remove plastic cover and check that bolt is tightened to proper torque 10 2 Test machine operation at this time not plugged in and wi...

Page 18: ...ight Rear Pivot Covers Ref 33 NOTE Install the center screws first on each side then the remaining screws ASSEMBLY PROCESS Step 11 Install Pivot Covers NOTE Right and left side covers are interchangea...

Page 19: ...the Left and Right Front Pivot Covers 35 12 3 Use 2 15mm Machine Screws Ref 37 to install the Left and Right Stabilizer End Caps 36 NOTE Insure that the 15mm Machine Screws Ref 37 are used in Step 12...

Page 20: ...3 Both Models Plug the large Main Control Wire into the back of the Computer Console 38 labeled as Main I O 13 4 EV 718 ONLY Plug the last wire assembly the Stride Sensor Control Wire into the back o...

Page 21: ...ld now be ready to use For complete operation instructions consult Owner s Manual 15 1 Please record the following information in case needed to assist with warranty service Software version is displa...

Page 22: ...ax 800 898 9410 CORPORATE HEADQUARTERS Nautilus Inc World Headquarters 16400 S E Nautilus Drive Vancouver Washington USA 98683 Phone 800 NAUTILUS INTERNATIONAL CUSTOMER SERVICE SWITZERLAND OFFICE Naut...

Page 23: ...23 Nautilus Pro Series Elliptical Assembly Manual...

Page 24: ...your home visit www Nautilus com 2007 Nautilus Inc All rights reserved Nautilus and the Nautilus logo are either registered trademarks or trademarks of Nautilus Inc Nautilus Inc World Headquarters 164...

Reviews: