![Nautel XR3 Installation Manual Download Page 27](http://html1.mh-extra.com/html/nautel/xr3/xr3_installation-manual_3628044027.webp)
XR6/XR3 Installation Manual
Installing the power transformer
Issue 3.1 2014-06-04
Page 3-3
Table 3.1: Three-phase primary winding tap nominal voltages (rms, phase-to-phase)
Table 3.2: Single-phase primary winding tap nominal voltages (rms, phase-to-phase)
Perform this procedure as part of installing the transmitter.
2. Remove the lower back cover from the transmitter.
WARNING:
The main power transformer weighs approximately 68 kg (150 lbs). Do
not attempt to move it unless sufficient manpower or mechanical
assistance is available to move it into position without damaging the
cabinet or causing injury to personnel.
Voltage (V ac)
Tap
198
6
208
5
218
4
229
3
239
2
250
1
Voltage (V ac)
Tap
342
6
361
5
380
4
399
3
418
2
437
1
or
Voltage (V ac)
Tap
200
4
220
3
240
2
260
1
NOTE:
Ac voltage applied to transformer
taps can be phase-to-phase (L-L) or phase-
to-neutral (L-N).
Summary of Contents for XR3
Page 2: ......
Page 4: ......
Page 8: ...XR6 XR3 Installation Manual Page viii Issue 3 1 2014 06 04...
Page 18: ...XR6 XR3 Installation Manual Page xviii Version 3 1 2014 06 04...
Page 24: ...XR6 XR3 Installation Manual Unpacking and positioning Page 2 4 Issue 3 1 2014 06 04...
Page 40: ...XR6 XR3 Installation Manual Installing the RF connector Page 6 6 Issue 3 1 2014 06 04...
Page 52: ...XR6 XR3 Installation Manual Adjusting the spark gap Page 7 12 Issue 3 1 2014 06 04...
Page 72: ...XR6 XR3 Installation Manual Control and monitoring Page 9 14 Issue 3 1 2014 06 04...
Page 84: ...XR6 XR3 Installation Manual Parts and tools Page 12 4 Issue 3 1 2014 06 04...
Page 99: ......