VS300 Operations and Maintenance Manual
Operating the transmitter
Page 2-178
Issue 8.0 2016-03-01
Scheduler
If the scheduler is enabled (see
Enabling the Scheduler on page 2-179
), you can program a preset
schedule for the transmitter. Use the
Scheduler
page (see
) to set the dates and times at
which presets take effect. You can define up to 63 different schedule rules. To view the
Scheduler
page, select
Scheduler
from the
Menu
options.
Figure 2.151: Scheduler page
The left-hand side of the
Scheduler
page displays a monthly calendar (e.g., September 2013). Use the
<<
and
>>
buttons to navigate between months. Use the
<
and
>
buttons to navigate to the beginning
and the end of the schedule.
The right-hand side of the
Scheduler
page contains a
Rules
section and a
Daily Events
section. All
programmed rules are displayed in the
Rules
section. Clicking on a specific date in the monthly
calendar displays the rules and daily events, as applicable, for that day.
Figure 2.152: Rule Explorer window
Summary of Contents for VS300
Page 2: ......
Page 4: ......
Page 8: ...VS300 Operations and Maintenance Manual Page viii Issue 8 0 2016 03 01...
Page 14: ...VS300 Operations and Maintenance Manual Description Page 1 6 Issue 8 0 2016 03 01...
Page 228: ......