3  CALIBRATION AND TESTING

 

This section contains setup, calibration, 
and testing to perform on the VR1000 
transmitter. 
 
(a)  Tune the new RF power block for the 

desired frequency by performing steps 
(a) through (c) of paragraph 2.4.2, 
‘Turn-On Prerequisites’, of the Vector 
NDB Technical Instruction Manual. 

 
(b)  Connect the transmitter’s RF output to 

a 50 

Ω

 dummy load rated for at least 

2,000 W. 

 
(c)  Switch on the ac breaker. 
 
(d)  Using the front panel GUI set the 

‘Number of Power blocks expected’ 
value to 2 (see 4.3.6.1 of the Vector 
NDB Technical Instruction Manual). 

 
(e)  Turn off (disable) modulation and set 

the transmitter to operate in 

BYPASS

 

mode (see 3.6.4 of the Vector NDB 
Technical Instruction Manual). 

 
(f)  Calibrate the transmitter’s output 

power (see 4.3.6.4 of the Vector NDB 
Technical Instruction Manual). 

 

(g)  Calibrate the reflected power 

thresholds and output network alarms 
(see 4.3.6.7 of the Vector NDB 
Technical Instruction Manual). 

 
(h)  Set the RF monitor level (see 4.3.6.8 

of the Vector NDB Technical 
Instruction Manual). 

 
(i)  Turn off the transmitter and reconnect 

its RF output into the ATU. 

 
(j)  Operate the transmitter at the desired 

power level. When the system is tuned 
normally, set the changeover mode 
and RF monitor thresholds (see 4.3.5.5 
of the Vector NDB Technical 
Instruction Manual) and setup/enable 
antenna current feedback (see 
4.3.5.10 of the Vector NDB Technical 
Instruction Manual). 

 
(k)  Return the transmitter to on-air 

service. 

 
 

 