NX300 Installation Manual
Unpacking and positioning
Page 2-2
Issue 3.0 2012-11-01
Figure 2.1: NX300 Cabinet Layout
4. Verify that the ac power cable from the ac power disconnect switch reaches the entry point
in the power transformer cabinet.
5. Verify that the RF feed cable reaches the RF output connector on the top of the output
cabinet.
6.
I
nstall the antenna ground switch on top of the transmitter cabinet as follows:
•
Locate the antenna ground switch (Nautel Part # 213-8320-05) that was packed with the
ancillary crate for shipping.
•
Open the front door of the output cabinet and unlock and open the filter door to gain
access to the inside of the transmitter cabinet.
•
Remove any protective wrapping from the antenna ground switch and position it on top
of the output cabinet cabinet, noting proper orientation and that the aluminum rod
protruding from the bottom of the antenna ground switch must pass through a clearance
hole in the transmitter cabinet (see
).
100 kW
Control
Cabinet
RACK 1
100 kW
Middle
Cabinet
RACK 2
100 kW
Output
Cabinet
RACK 3
Transformer
Cabinet
T1
(position is
user-defined)
Cable Tray System
(shown with overhead supports)
Summary of Contents for NX300
Page 2: ......
Page 4: ......
Page 8: ...NX300 Installation Manual Page viii Issue 3 0 2012 11 01...
Page 22: ...NX300 Installation Manual Completing cabinet assembly Page 3 8 Issue 3 0 2012 11 01...
Page 40: ...NX300 Installation Manual Adjusting the spark gap Page 7 4 Issue 3 0 2012 11 01...
Page 46: ...NX300 Installation Manual Installing audio inputs Page 8 6 Issue 3 0 2012 11 01...
Page 58: ...NX300 Installation Manual Parts and tools Page 11 4 Issue 3 0 2012 11 01...
Page 69: ......