NX100 Installation Manual
Unpacking and positioning
Issue 3.2 2017-03-31
Page 2-1
Section 2:
Unpacking and positioning
To install an NX100 transmitter, perform the following tasks:
1. Lift and slide the transmitter cabinets off the base of their crates. The NX100 contains two
main crates - a control cabinet and a transformer cabinet. Crated and uncrated cabinet
weights are shown in
. An additional crate, which contains the ac safety interlock
switch, may be provided.
Table 2.1: NX100 Cabinet Weights
2. Using necessary mechanical assistance (forklift, etc), position the two cabinets in their final
WARNING:
Do not move the transformer cabinet unless sufficient manpower or
mechanical assistance is available to move it into position without
damaging the cabinet or causing injury to personnel.
Note:
The position of the transformer cabinet can be determined by the user. The cabinet’s location
should accommodate input wiring from the ac power source (or ac power disconnect switch), output
wiring to each of the transmitter cabinets, as well as a cable carrying system to support the output
wiring.
Cabinet
Crated Weight
kg (lbs)
Uncrated Weight
kg (lbs)
687 (1515)
567 (1250)
845 (1863)
753 (1659)
Control Cabinet
Transformer Cabinet
Ac Power Disconnect
Switch
TBA (TBA)
TBA (TBA)
Summary of Contents for NX100
Page 2: ......
Page 4: ......
Page 8: ...NX100 Installation Manual Page viii Issue 3 2 2017 03 31...
Page 32: ...NX100 Installation Manual Adjusting the spark gap Page 6 4 Issue 3 2 2017 03 31...
Page 38: ...NX100 Installation Manual Installing audio inputs Page 7 6 Issue 3 2 2017 03 31...
Page 52: ...NX100 Installation Manual Parts and tools Page 10 4 Issue 3 2 2017 03 31...
Page 65: ......