GV20/GV15 INSTALLATION MANUAL
INSTALLING THE RF FEED CABLE
PAGE 2.6.2
VERSION 5.0 2021-03-01
Figure 2.6.1: Passing RF feed cable through ferrite toroids
7.
Locate and remove the 3/8 inch hardware (nuts, split washers and flat washers) from the output
stud plate on the top of the transmitter RF output connector.
8.
Carefully install the RF feed cable's EIA flange connector on the RF connector’s flange-mounting
studs. Ensure its bullet mates with the rigidly mounted cup connector inside the RF output
connector and the alignment pin of the flange lines up with the clearance hole in the stud plate.
Ensuring the bullet has a tight fit to minimize overheating. Secure using attaching hardware
removed in
. Ensure nuts are firmly tightened.
9.
RF feed cable
Ferrite Toroids
Use two LP32 for 3-1/8 inch cable
Field Flange
Install ferrite toroids
on feed cable before
installing
Summary of Contents for GV20
Page 2: ......
Page 4: ......
Page 8: ...GV20 GV15 INSTALLATION MANUAL PAGE 2 VIII VERSION 5 0 2021 03 01...
Page 18: ...GV20 GV15 INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 5 0 2021 03 01...
Page 24: ...GV20 GV15 INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 6 VERSION 5 0 2021 03 01...
Page 36: ...GV20 GV15 INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 5 0 2021 03 01...
Page 50: ...GV20 GV15 INSTALLATION MANUAL COMMISSIONING PAGE 2 9 8 VERSION 5 0 2021 03 01...
Page 54: ...GV20 GV15 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 5 0 2021 03 01...
Page 64: ...GV20 GV15 INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 5 0 2021 03 01...
Page 65: ......