background image

15. FACING THE FRONT SIDE OF THE AMADINDA

HOOK THE CABLE LOOPS FROM THE THE TOP
SIDE OF THE KEYS TO POSTS 'B' AND 'C'.

16.

HOOK THE LOOPS ON THE AMADINDA TO THE
TURNBUCKLE BY LOOSENING THE NUT ON THE
TURNBUCKLE REMOVE THE BOLT, SLIDE THE
CABLE LOOP INTO THE OPENING AND SLIDE
THE BOLT THROUGH THE TURNBUCKLE HOLES,
THROUGH THE CABLE LOOP AND THROUGH THE
OTHER TURNBUCKLE HOLE AND RE-SECURE
THE NUT

17.

REPEAT STEPS 15 & 16 FOR THE OTHER TWO
CABLES ON POSTS 'A' AND 'D'

18.

LOOSEN OR TIGHTEN TURNBUCKLES TO

CORRECT MEASUREMENT TO GET THE

LONGEST KEY TO BE 228mm [9"] OR GREATER

OFF THE FINISHED SURFACE.

18.1.

TURNBUCKLES ON LOWER POSTS ('A' AND
'C') TO HAVE 50mm [2"] GAP BETWEEN
THREADED RODS.

18.2.

TURNBUCKLES ON HIGHER POSTS ('B' AND
'D') TO HAVE 70mm [2 

3

4

"] GAP BETWEEN

THREADED RODS.

19.

THE SOARING AMADINDA IS APPROXIMATELY AS
TIGHT AS IS REQUIRED WHEN THERE IS NO
MORE THAN 228mm [9"] BETWEEN THE

LOWEST KEY AND THE GROUND. MEASURE THE
DISTANCE FROM THE POLY-COATED AIRCRAFT

CABLE TO THE POST SIDE OF THE EYE BOLT.

20. CUT HEAT SHRINK FOR EACH POST 1 

1

2

" LONGER

THAN YOUR MEASUREMENTS. CUT THE EYE
BOLT SIDE ON THE SAME ANGLE AS IS MADE
BY THE TURNBUCKLE TO THE POST.

21.

DISCONNECT THE SOARING AMADINDA ENDS
(ONE AT A TIME) TO SLIDE THE HEAT-SHRINK

TUBING OVER THE HARDWARE.    NOTE: DO NOT
CUT THE HEAT-SHRINK TUBING LENGTH-WISE.

22. ROLL HEAT SHRINK BACK BY 1" - 2" ON THE

POST END OF THE TURNBUCKLE TO EXPOSE

THE BOLT.

23. HANG THE LOSE TURNBUCKLE BACK ON THE

EYE BOLT AND ROLL THE HEAT SHRINK OVER
THE EYE BOLT.

24. SLIDE THE HEAT SHRINK UP OR DOWN TO

ACCESS THE TURNBUCKLE; THIS WILL BE
DIFFICULT, BE PATIENT.

25. TIGHTEN TURNBUCKLE AS PER STEPS  18 & 19.
26. REPEAT STEPS 20 - 25 FOR EACH

TURNBUCKLE

27. USING A HEAT GUN (PAINT STRIPPER), GENTLY

AND EVENLY HEAT THE HEAT-SHRINK FOR IT TO
SHRINK DOWN TIGHT TO THE HARDWARE.  (IF IT
SMOKES IT'S TOO HOT; DISTRIBUTE HEAT MORE
EVENLY).

28. HEAT-SHRINK SHOULD COVER ALL HARDWARE

LEAVING EYE BOLT AND THE EYE ON THE

SOARING AMADINDA ONLY PARTIALLY EXPOSED
WITH LESS THAN 

3

8

" OF THE HOLE EXPOSED.

29. RESTORE ADJACENT SURFACING TO

PRE-CONSTRUCTION CONDITION UNLESS
OTHERWISE SPECIFIED.

HEAT SHRINK

RECOMMENDED

AMOUNT OF

EXPOSED

HARDWARE

- PLAN -

- ATTACHMENT DETAIL -

 

N.T.S.

STEP 4: HANGING YOUR SOARING AMADINDA (CAUTION - HEAVY! TWO PEOPLE REQUIRED)

N.T.S.

N

s

INSTRUMENTS

FOR YOUR PLAYGROUND

DETAIL

PRODUCT NUMBER

PAGE

SCALE @ 8.5x11

DRAWN

CHECKED

PHONE NUMBER:

1-877-733-7459

NI-PG-

SOARING AMADINDA: POST MOUNT

403-06

SE

SE

4  OF 4

Summary of Contents for NI-PG-403-06

Page 1: ...MEASURE UP PERPENDICULAR TO LAYOUT LINE 1 ONE 114mm 41 2 THIS IS THE CENTRE POINT OF POST D 7 AGAIN AT THE END OF LAYOUT LINE 1 ONE MEASURE UP PERPENDICULAR TO LAYOUT LINE 1 ONE 643mm 241 2 THIS IS THE ENTER POINT OF POST C 3127mm 123 POST A POST B POST C POST D LAYOUT LINE 1 ONE 745mm 29 1 4 3127mm 123 507mm 20 620mm 24 1 2 113mm 4 1 2 STEP 1 SPACE REQUIREMENT POST LAYOUT COMPONENTS LAYOUT PLAN N...

Page 2: ... D NOTE THE EYEBOLT ON POST B SHOULD BE FACING THE EYEBOLT ON POST C THE EYEBOLT ON POST A SHOULD BE FACING THE EYEBOLT ON POST D 3193mm 125 3 4 3193mm 125 3 4 POST A POST B POST C POST D LAYOUT PLAN STEP 2 POST LAYOUT VERIFICATION N T S N s INSTRUMENTS FOR YOUR PLAYGROUND DETAIL PRODUCT NUMBER PAGE SCALE 8 5x11 DRAWN CHECKED PHONE NUMBER 1 877 733 7459 NI PG SOARING AMADINDA POST MOUNT 403 06 SE ...

Page 3: ...O THE EYE BOLT IS APPROXIMATELY 787mm 31 ABOVE FINISHED GRADE 14 FOLLOW INSTRUCTIONS ON THE BACK OF THE CONCRETE BAG 745mm 29 1 4 POST A POST B 500mm 19 3 4 POST D POST C 787mm 31 508mm 20 508mm 20 787mm 31 POST C AND D SECTION POST A AND B SECTION STEP 3 POST INSTALLATION TOP OF CONCRETE FOOTING 0 152m 6 LOCATION OF LIFTING BOLTS BOTTOM OF CONCRETE FOOTING 1 220m 48 FINISHED GRADE 0 000m 0 N T S ...

Page 4: ...IS MADE BY THE TURNBUCKLE TO THE POST 21 DISCONNECT THE SOARING AMADINDA ENDS ONE AT A TIME TO SLIDE THE HEAT SHRINK TUBING OVER THE HARDWARE NOTE DO NOT CUT THE HEAT SHRINK TUBING LENGTH WISE 22 ROLL HEAT SHRINK BACK BY 1 2 ON THE POST END OF THE TURNBUCKLE TO EXPOSE THE BOLT 23 HANG THE LOSE TURNBUCKLE BACK ON THE EYE BOLT AND ROLL THE HEAT SHRINK OVER THE EYE BOLT 24 SLIDE THE HEAT SHRINK UP OR...

Page 5: ...1224mm 48 1223mm 48 1225mm 48 1227mm 48 N T S N s INSTRUMENTS FOR YOUR PLAYGROUND DETAIL PRODUCT NUMBER PAGE SCALE 8 5x11 DRAWN CHECKED PHONE NUMBER 1 877 733 7459 NI PG SOARING AMADINDA POST MOUNT LAYOUT 403 06 SE SE 1 OF 1 ...

Reviews: