background image

Post Walk

Installation Instructions

NOTES: Please check for any damage caused by the shipping company and take appropriate steps 
to file a claim, if needed. 

*Please call 

Digsafe

 and check for any underground utilities before digging anywhere.

Materials needed

Several pieces of 3-4’ long strapping , and twice as many pointed stakes made from strapping (strapping not 
provided), sheetrock screws and cordless drill with bit for the screws, 4’ piece of rebar to stir the concrete in the 
post holes, Post hole shovel, level, tape measure, 50 lb bags of premixed concrete (not included).  Concrete 
amounts can be easily calculated at 

http://www.quikrete.com/Calculator/Main.asp

.  Amount required depends 

on how deep you dig the holes.

1. Keep in mind that this is a climbing element and therefore it needs a fall zone extending 6 feet out 

on all sides of it which is minimum 9” deep. You can create a container for this material by using 
either 1 layer of 6x6 retainers made for this purpose (which we can provide)around a 3” deep 
“hole” in the ground, or by digging a hole 9” deep. If you choose to dig the 9” deep hole, keep in 
mind that it needs to be drained so it doesn’t fill up with rainwater or snow melt.

2. Unwrap items or remove from pallet.

3. Assemble post walk pieces.  Attach 2x6’s (leg extensions) to 6x6’s (posts) using screws provided 

through pre-drilled pilot holes.  The angle cut should be on top of the leg extension, top part of the 
angle against the post.

4. Lay out a course on the ground that will provide a challenging way for children to get from one end 

to the other. Random distances between posts, and random heights will be best. Keep tallest posts 
no higher than is good for the age group.

5. Dig a 12” round post hole to approximately 4’ (depending on soil and frost conditions, bottom may 

be cut off post 2x6 extension if digging holes full depth is too difficult .  A general rule of thumb is 
that you want minimum one third of the total post height w extensions in the ground).

6. Lift post assembly and set bottom of post extensions into hole. Twist post so upper 6x6 faces 

desired orientation. 

7. Using sheetrock screws, attach strapping to 2 adjacent sides at the top of the post, other ends of 

strapping on the ground. Drive stakes next to strapping 1’ in from end of strapping. 

8. Use level on 2 adjacent sides of post to makes sure post is plumb in both directions, and then 

screw strapping into stakes to hold post plumb.  

9. Mix concrete per instructions on bag, pour into hole (or pour concrete directly from the bag into the 

hole alternately with water (not too much!) Until it forms a thick slurry. Use rebar or stick to stir 
concrete in hole and punch out air holes, then let concrete cure.  Remember that all concrete must 
be at the bottom of the fall zone.  

Page   of 

1

3

Reviews: