![background image](http://html.mh-extra.com/html/national-semiconductor/lmk03000c/lmk03000c_operating-instructions-manual_710383004.webp)
L M K 0 3 0 0 0 C
E V A L U A T I O N B O A R D O P E R A T I N G I N S T R U C T I O N S
4
Read first, Basic Operation
Read the document,
“Installing CodeLoader 4 & USB Driver”
for instructions to prepare the computer
for usage with the evaluation board before continuing with the hardware setup.
For basic operation…
1. Connect a low noise
3.3 V
power supply to the
Vcc
connector located at the top left of the
board
2. Connect the CodeLoader cable to the
uWire
header located in the lower left.