![National ramp New Step Breeze Quick Installation Manual Download Page 6](http://html.mh-extra.com/html/national-ramp/new-step-breeze/new-step-breeze_quick-installation-manual_710344006.webp)
9.
Insert four plastic black square caps to top
of step upper and lower posts.
10.
Anchor left and right step base and legs
plates to ground. Total of 12 anchors; 6 per
side.
Step installation is complete!
Continue to step 11 if you are installing a
gate.
11.
The next steps will cover installing a gate to
the step system.
Assemble the gate hinges to the gate and
test fit against step upper post. Gate can be
installed on either left or right step upper
posts.
Mark and drill lower gate bracket first.
12.
Fasten each gate bracket to step upper post
using:
Two ¼"-20 x 2" hex head bolts
Four ¼" washers
Two ¼"-20 acorn nuts
(platform side)
(step side)