160-Pin Cable Installation Instructions
|
© National Instruments
|
3
2.
Tighten the thumbscrews on the cable.
3.
Complete one of the following steps and refer to Tables 4 through 9 in the
section to determine how to connect signals to your application.
•
Connect the D-SUB connectors on the cable to your application. For screw terminal
access, you can connect directly to NI TBX-50 terminal blocks.
•
Connect the second 160-Pin DIN connector on the cable to your application.
•
Connect the unterminated wires to your application.
Figure 2.
SH160DIN-4XDB50F-2A Cable
1
160-Pin DIN Connector
2
Thumbscrews
3
Cable Leg Labels
4
50-Pin Female D-SUB Connectors
150V
NATIONAL INSTRUMENTS
P3
P4
P2
P1
4
3
2
1
2