![National Instruments PXIe-4353 Installation Manual Download Page 5](http://html1.mh-extra.com/html/national-instruments/pxie-4353/pxie-4353_installation-manual_3523837005.webp)
©
National Instruments Corporation
5
NI PXIe-4353 and TB-4353 Terminal Block Installation Guide
Step 3. Connect the Signals
Caution
To ensure the specified EMC performance, operate this product only with shielded cables
and accessories.
Note
Refer to the
Read Me First: Safety and Electromagnetic Compatibility
document before
removing equipment covers or connecting or disconnecting any signal wires.
To connect signals to the terminal block, refer to Figures 3 and 4 while completing the following steps:
Note
You can find the pinout names and locations in MAX at any time by right-clicking the device
name under
Devices and Interfaces
and selecting
Device Pinouts
.
1.
Loosen the captive top cover screws and remove the top cover.
2.
Loosen the strain-relief screws and remove the strain-relief bar.
3.
Prepare the signal wire by stripping the insulation no more than 7 mm (0.28 in.).
4.
Run the signal wires through the strain-relief opening.
Figure 3.
TB-4353 Parts Locator Diagram
1
Strain-Relief Screws
2
Strain-Relief Bar
3
Tie Wrap Holes
4
Ground Lugs
5
Terminal Block to Module Connector
6
Captive Top Cover Screws
7
Top Cover
8
Tie Wraps
9
Signal Wires
5
9
8
7
6
6
4
3
4
1
2
1