14
Verifying the EPROM Installation
To verify that you have properly installed the EPROM, plug in the unit and power
on your GPIB-232CT-A. The POWER indicator should come on immediately.
The READY indicator should come on after the GPIB-232CT-A has passed its
power-on self test, indicating the unit is ready for operation. If the READY
indicator does not come on within seven seconds after the unit is powered on,
recheck the assembly and retry the power-on sequence. If the READY indicator
still does not come on, carefully fill out the forms in Appendix G, Customer
Communication, of the GPIB-CT IBCL Reference Manual, and call National
Instruments.
You are now ready to start using the GPIB-232CT-A. Attach your GPIB cables.
Refer to the GPIB-CT IBCL Reference Manual for information on programming.