background image

QUICK START GUIDE

FieldPoint FP-20

xx

Selecting an Environment for the FieldPoint System

NI FieldPoint is designed for static installations. Static installations are
installations that do not move and are not subject to shock and vibration. 
NI recommends Compact FieldPoint for mobile systems and for locations that
are subject to shock and vibration. 

The FieldPoint system should be mounted inside an instrumentation cabinet
such as the FP-ENC1. NI offers two versions of the FP-ENC1, one with a solid
metal door and one with a polycarbonate window. Both versions include a DIN
rail for mounting the FieldPoint system inside the cabinet.

1

What You Need to Get Set Up

FP-20

xx LabVIEW RT controller

35 mm DIN rail

Two DIN rail locks (included)

Terminal base(s)

I/O module(s)

11–30 VDC power supply

Accessories: Ethernet cable, 
flathead screwdriver

Ferrite clip for Ethernet cable, 
NI part number 711856-01

PC running Windows

National Instruments FieldPoint
Software CD

LabVIEW RT

322759e.qxp  4/22/2004  4:00 PM  Page 1

Summary of Contents for FieldPoint FP-20 Series

Page 1: ...strumentation cabinet such as the FP ENC1 NI offers two versions of the FP ENC1 one with a solid metal door and one with a polycarbonate window Both versions include a DIN rail for mounting the FieldPoint system inside the cabinet 1 What You Need to Get Set Up FP 20xx LabVIEW RT controller 35 mm DIN rail Two DIN rail locks included Terminal base s I O module s 11 30 VDC power supply Accessories Et...

Page 2: ...other Mounting the FieldPoint System on a DIN Rail Mounting the DIN Rail on a Solid Support Use screws to mount the DIN rail securely to a solid support such as the inside of an instrumentation cabinet Place the screws 100 mm 4 in apart Note Do not use spliced DIN rails Use only a single DIN rail Installing the Network Module A Unlock rail clip B Hook lip on back of module onto top of DIN rail pre...

Page 3: ...al bases while power is applied to the network module A Unlock rail clip B Press base onto rail C Slide base into position and lock rail clip Be careful not to bend any pins D Repeat for each terminal base up to nine for each network module in most cases Make sure there are no gaps between terminal bases National Instruments Corporation 3 FP 20xx Quick Start Guide 322759e qxp 4 22 2004 4 00 PM Pag...

Page 4: ...int Bus Extender cables from NI E You must install DIN rail locks at each end of the bank to ensure reliable connections between terminal bases and network module Two rail locks are included with each network module Place protective cover on the bus connector of the last terminal base FP 20xx Quick Start Guide 4 ni com 322759e qxp 4 22 2004 4 00 PM Page 4 ...

Page 5: ... cascading power Caution Cascading power defeats isolation For more accurate measurements place thermocouple modules away from heat sources including network modules and relay modules and mount thermocouple modules on FP TB 3 terminal bases A Align slots on module with guide rails on base and press module onto base until terminal base latch locks module in place B Repeat for each I O module Nation...

Page 6: ...on and transients The area in which your signal wires are located as well as the types of wires used to connect device to the FieldPoint system determine how much these types of interference affect signals Electrostatic induction comes from electrical fields radiated by voltage sources such as power lines Electrical fields near signal wires can add noise to signals You can reduce this type of inte...

Page 7: ...so called voltage spikes can be induced on signal wires by sources such as lightning strikes If your signal wires are in an environment susceptible to lightning strikes or other sources of transients run the wires through a metal conduit grounded in several places or through a thick shield grounded in several places Note A foil shield is not thick enough to protect against transients and should be...

Page 8: ...omputer using an Ethernet crossover cable Do not use a cable longer than 100 m If you are using a 100 Mbps Ethernet National Instruments recommends using a Category 5 shielded twisted pair cable If you need to build your own cable refer to the FP 20xx User Manual specifications section for cabling details 4 FP 20xx Quick Start Guide 8 ni com Crossover Cable Straight Through UTP Cable Straight Thro...

Page 9: ...Install a ferrite clip NI part number 711856 01 on the Ethernet cable 10 in or less from the FP 20xx National Instruments Corporation 9 FP 20xx Quick Start Guide 322759e qxp 4 22 2004 4 00 PM Page 9 ...

Page 10: ...inimum power supply such as the NI PS 4 or PS 5 B Install a ferrite on the power supply leads less than 10 in from the ends of the leads as shown C Install a tie wrap to secure the ferrite 5 FP 20xx Quick Start Guide 10 ni com 322759e qxp 4 22 2004 4 00 PM Page 10 ...

Page 11: ...for the power requirements of each module F Connect power to the I O modules that require external power for outputs examples include output counter relay PWM PG and QUAD modules It is generally best to power each such module by connecting an external power supply to the VSUP and COM terminals Refer to the I O module operating instructions for power requirements detailed wiring diagrams and safe w...

Page 12: ...P TC 120 1516 V 31 32 C V 1 3 2 C 17 18 Separate Power Supply Recommended Cascaded Power Defeats Isolation No External Power Required Power supply connected to VSUP and COM terminals Caution Cascading power defeats isolation Shades of gray indicate different voltage potentials FP 20xx Quick Start Guide 12 ni com 322759e qxp 4 22 2004 4 00 PM Page 12 ...

Page 13: ...er supply to the FieldPoint bank You should see the POWER and STATUS LEDs come on After about 5 seconds the STATUS LED begins flashing This indicates that the FP 20xx is ready to be configured If the STATUS LED turns off the FP 20xx has been configured If the LEDs do not follow this sequence refer to the FP 20xx User Manual troubleshooting appendix 7 6 National Instruments Corporation 13 FP 20xx Q...

Page 14: ...al Instruments FieldPoint Software CD into the CD ROM drive of your computer D Follow the onscreen instructions to complete the installation Note If the setup does not launch automatically select Start Run from Windows enter d setup where d is the letter of the CD ROM drive and select OK Configuring the FP 20xx Launch NI Measurement Automation Explorer MAX to configure the FP 20xx For information ...

Page 15: ...ated Maximum cabling distance 100 m segment Maximum power supplied to terminal bases 9 W Maximum number of banks Determined by network topology Memory FP 2000 32 MB nonvolatile 16 MB DRAM FP 2010 64 MB nonvolatile 32 MB DRAM FP 2015 512 MB nonvolatile 32 MB DRAM For information about the memory used by the LabVIEW RT module and the operating system go to ni com info and enter rdfpec National Instr...

Page 16: ...uctor wire with 7 mm 0 28 in of insulation stripped from the end Torque for screw terminals 0 5 0 6 N m 4 4 5 3 lb in Weight 278 g 9 8 oz Environmental FieldPoint modules are intended for indoor use only For outdoor use they must be installed in a suitable sealed enclosure Operating temperature 25 to 55 C Storage temperature 55 to 85 C Humidity 10 to 90 RH noncondensing Maximum altitude 2 000 m Po...

Page 17: ...s refer to the product label or visit ni com hardref nsf search by model number or product line and click the appropriate link in the Certification column Electromagnetic Compatibility CE C Tick and FCC Part 15 Class A Compliant Emissions EN 55011 Class A at 10 m FCC Part 15A above 1 GHz Immunity EN 61326 1997 A2 2001 Table 1 Note For EMC compliance operate this device with shielded cabling Nation...

Page 18: ...C Note Refer to the Declaration of Conformity DoC for this product for any additional regulatory compliance information To obtain the DoC for this product visit ni com hardref nsf search by model number or product line and click the appropriate link in the Certification column Mechanical Dimensions FP 20xx Quick Start Guide 18 ni com 109 5 mm 4 31 in 91 44 mm 3 60 in 107 19 mm 4 22 in 322759e qxp ...

Page 19: ...many 49 0 89 741 31 30 Greece 30 2 10 42 96 427 India 91 80 51190000 Israel 972 0 3 6393737 Italy 39 02 413091 Japan 81 3 5472 2970 Korea 82 02 3451 3400 Malaysia 603 9131 0918 Mexico 001 800 010 0793 Netherlands 31 0 348 433 466 New Zealand 0800 558 322 Norway 47 0 66 90 76 60 Poland 48 22 3390150 Portugal 351 210 311 210 Russia 7 095 783 6851 Singapore 65 6226 5886 Slovenia 386 3 425 4200 South ...

Reviews: