
Power Up the FieldPoint System
7
8
FP-1601 Quick Start Guide
Connect to Field Devices
Use the operating instructions for each I/O module to help you connect field devices.
6
ni.com
CAUTION
Connect terminal bases to the FP-1601 before applying power.
Make sure the RESET DIP switch is
not on. Plug in each power supply to
the FieldPoint bank. You should see
the
POWER
and
STATUS
LEDs come
on. After about 5 seconds, the
STATUS
LED begins flashing, one
flash at a time. This indicates that the
FP-1601 is ready to be configured. If
the LEDs do not follow this sequence,
refer to the
FP-1601 User Manual
troubleshooting appendix.
1
2
3
4
5
6
7
RESET
O
F
F
/
O
N
322978c.qxd 4/4/2003 4:08 PM Page 8