National Flooring Equipent GP30 Service Manual Download Page 16

Warranty

14

National Flooring Equipment Inc. (referred to as “the Company”) warrants that each new unit manufactured by The Company, to be free from 

defects in material and workmanship in normal use and service for a period of twelve (12) months from date of shipment from the Company. For 

administrative ease, will honor warranty for a period of fifteen (15) months from date of shipment from the company. Accessories or equipment 

furnished and installed on the product by the Company but manufactured by others, including but not limited to: engines, motors, electrical com-

ponents, transmissions etc., shall carry the accessory manufacturers own warranty. Battery warranties are prorated over the warranty period. 

Customer is responsible for the inspection of equipment / parts upon delivery. Freight damages reported beyond authorized time frame will not 

be honored.

The Company, at its determination of defect, will repair or replace any product or part deemed to be defective in material or workmanship within 

specified warranty time period. All product determinations and / or repairs will take place at the designated Company repair facility, or at a certi

-

fied warranty location designated by the Company. The Company will coordinate and be responsible for all freight expenses associated with 

valid warranty claims. Freight and shipping expenses associated with abuse or misuse will be back charged to the Distributor/Customer. The 

Company reserves the right to modify, alter or improve any part / parts without incurring any obligation to replace any part / parts previously sold 

without such modified, altered or improved part / parts. In no event shall the seller or manufacturer of the product be liable for special, incidental, 

or consequential damages, including loss of profits, whether or not caused by or resulting from the negligence of seller and / or the manu

-

facturer of the product unless specifically provided herein. This warranty shall not apply to any products or portions there of which have been 

subjected to abuse, misuse, improper installation or operation, lack of recommended maintenance, electrical failure or abnormal conditions and 

to products which have been tampered with, altered, modified, repaired, reworked by anyone not approved or authorized by the Company or 

used in any manner inconsistent with the provisions of the above or any instructions or specifications provided with or for the product. Any and 

all unauthorized onsite warranty work conducted by unauthorized personnel or any outside person(s), is not covered by the Company unless 

the work has been pre-authorized by a predetermined manufacturer representative. This excludes wearable parts and/or consumables.

Defective or failed material or equipment shall be held at the purchaser’s premises until authorization has been granted by the Company to 

return or dispose of defective products. Products returned for final inspection must be returned with a manufacturer authorized Return Material 

Authorization (RMA). Any unauthorized return of equipment will be declined at the dock by the Company. Any non-approved items returned 

with approved returned items are subject to rejection and will not be credited. Credit will be issued for material found to be defective upon the 

Company’s inspection based on prices at time of purchase.

TO OBTAIN SERVICE CONTACT NATIONAL FLOORING EQUIPMENT, INC. TOLL FREE AT 800-245-0267 FOR A REPAIR 

AUTHORIZATION NUMBER. COD FREIGHT RETURNS WILL NOT BE ACCEPTED. FREIGHT COLLECT SHIPMENTS WILL 

NOT BE ACCEPTED. WARRANTY REPAIRS MUST BE ACCOMPANIED BY DATE OF PURCHASE RECEIPT AND A RETURN/

REPAIR AUTHORIZATION NUMBER.

RETURN/REPAIR AUTHORIZATION NUMBER: _____________________________
MACHINE SERIAL NUMBER: ____________________________________________

Summary of Contents for GP30

Page 1: ...Read Manual Before Servicing Machine 402977 Rev D GP30 GRINDER SERVICE MANUAL...

Page 2: ...ns 2 3 0 Parts 6 4 0 Maintenance 7 8 0 Troubleshooting Diagnostics 8 9 0 Parts List and Diagrams 10 Please note The following safety instructions must be followed as shown in this operating manual Fai...

Page 3: ...olis MN 55445 1 2 Unit Specifications Dimensions Length 86 in 218 cm Width 30 in 76 cm Height 52 in 132 cm Weight 1 320 lbs 599 kg Connected loads of the electrical system Power 30 HP Electrical Conne...

Page 4: ...terial damages Electrical Warning Warning against dangerous voltages 2 2 Organizational Measures The Operating Instructions are to be kept near where the machine is located and must be reachable at al...

Page 5: ...nd the operation of fire extinguishers must be made known on each building site Take note of the procedures for fire reporting and fighting fires 2 3 Personnel Selection and Qualification Only reliabl...

Page 6: ...n section 2 6 to prevent the machine from being turned on accidentally Adjustments servicing inspection work and inspection intervals specified in this manual as well as any information on the replace...

Page 7: ...with a red and white safety chain and a danger sign Use tools that are insulated against voltages Only start work once familiar with the electrical engineering regulations that apply to the area Only...

Page 8: ...356 Tool Plate Edging Qty Part Description 1 401454 Coupler Morflex 6 1 401455 EG Female Adapter Quick Change 1 401456 Combination Tool Holder GP Grinders 1 401457 Woodruff Key 1 401466 Diamond Org 2...

Page 9: ...the period can be extended Due to different working conditions the frequency of inspections for wear checks may vary Prepare a suitable inspection schedule considering your own working conditions 4 2...

Page 10: ...act wrench and in socket 4 Use pry tool to remove coupler from tool plate 5 Replace with new coupler 6 Replace bolts through new coupler and into tool plate Tighten with impact wrench 7 Place tool pla...

Page 11: ...ooling Dust being produced Shroud is out of adjustment Adjust shroud and tighten to no more than 2 mm above floor Dust hose is clogged Inspect dust hose and ports for debris that may be clogging hose...

Page 12: ...17 16 HX M10 x 30 18 4 Stud M18 x 2 5 x 3 LG 19 4 Lock Nut M18 20 1 Sq HD Plug 3 4 14 NPT 21 1 Sq HD Plug 1 NPT 23 1 Helical Gear 24 1 Housing 25 1 Cover 26 1 Input Pinion 27 4 Cover 28 2 Gear 89T 29...

Page 13: ...ch with Plate 30HP 107 1 Dead Man Key 108 1 1 90 Cord Grip 6 4 109 1 Water Valve 110 2 Swivel Caster 111 2 Main Caster red wheel 112 1 Axle 113 2 2 in Vacuum Hose 3 ft 114 1 3 in Vacuum Hose 3 ft 115...

Page 14: ...ter 4 1 Propane Tank 5 1 Battery 12V 6 1 Regulator 7 1 Battery Cable and Plug 8 1 Wiring Harness 9 1 Emissions Box includes O 2 Sensor 10 1 Oil Filter 11 2 Spark Plug 12 2 Tensioner Bearing 13 2 Flang...

Page 15: ...13 5 6 1 2 3 4 Item Qty Description 1 1 Turn to Lock Throttle Cable 2 1 Ignition Switch w Keys 3 1 Clutch Switch 6 pin 4 1 Tach Hour Meter 5 1 Water Valve Lever 6 1 Dead Man Switch...

Page 16: ...or not caused by or resulting from the negligence of seller and or the manu facturer of the product unless specifically provided herein This warranty shall not apply to any products or portions there...

Page 17: ......

Page 18: ...LOORING EQUIPMENT 9250 Xylon Avenue N Minneapolis MN 55445 U S A Toll free 800 245 0267 Phone 763 315 5300 Fax 800 648 7124 Fax 763 535 8255 Web Site www nationalequipment com E Mail info nationalequi...

Reviews: