![National Crane 600H Service Manual Download Page 162](http://html1.mh-extra.com/html/national-crane/600h/600h_service-manual_3360637162.webp)
OUTRIGGERS
600H SERVICE MANUAL
7-12
08-19-2022 Control # 092-13
Installation
1.
Reconnect the hydraulic hoses for the jack cylinder as
per removal tags.
2.
Secure the hydraulic hoses with the retainers as shown
in (Figure 7-14). Run the jack hoses through the loops at
the bottom and end of the beam. Tie wrap the jack hoses
together every 12 in (30.48 cm).
3.
Slide the extension cylinder into the outrigger beam.
Make sure the jack hydraulic hoses are routed as shown
in Figure 7-14.
4.
Insert the extension cylinder rod into the keyhole and
reinstall the keeper.
5.
Bolt the barrel end to the of the extension cylinder to the
outrigger box.
6.
Reconnect the hydraulic hoses as per removal tags and
reinstall the end plate.
FIGURE 7-13
Keeper
Keeper Bolts
Keyhole
Extension
Cylinder
Rod End
Access Hole
Tie wrap these hoses together
every 12 in (30.9 cm)
FIGURE 7-14
Loops for Jack
Cylinder Hoses
Retainer for
Hydraulic Hoses
Route Hoses
Under the Bar
Retainer for Hydraulic Hoses
REFERENCE ONLY
Summary of Contents for 600H
Page 1: ...Service Manual National Crane 600H R E F E R E N C E O N L Y...
Page 6: ...THIS PAGE BLANK R E F E R E N C E O N L Y...
Page 136: ...BOOM 600H SERVICE MANUAL 4 62 08 19 2022 Control 092 13 R E F E R E N C E O N L Y...
Page 231: ...R E F E R E N C E O N L Y...
Page 232: ...R E F E R E N C E O N L Y...