
EN
W415-2978 / 02.16.21
5
table of contents
1.0 general
information
6
1.1
combustion and ventilation air
6
1.2
rates and effi ciencies
7
1.3 installation
overview
7
1.4 hardware
list
8
1.5
rating plate information
9
2.0 dimensions
10
3.0 location
11
4.0 framing
12
4.1
gas inlet locations
12
4.2
minimum framing dimensions
13
4.3
minimum enclosure clearances
14
4.4
minimum clearance to combustible enclosures
15
4.5
steel header installation
16
5.1
hard wiring connection
17
5.2
receptacle wiring diagram
17
5.0 electrical
information
17
5.3 wiring
diagram
18
5.4
transmitter installation and operation
19
5.5
control module operation
20
6.0 gas
installation
21
6.1
propane cylinder specifi cations
21
6.2
propane gas cylinder mounting
21
7.0 operation
22
8.0
nailing tabs and strips
23
8.1
nailing tab installation (located in manual baggie)
23
8.2
nailing strip installation
23
9.0 finishing
24
9.1
birch wood log placement (BLKO36)
24
9.2
oak wood log placement (OLKO36)
26
9.3
minimum mantel clearances
28
9.4 logo
placement
28
10.0 adjustments
29
10.1 venturi
adjustment
29
10.2 fl ame characteristics
29
10.3
check pressure readings
30
11.0 maintenance
31
12.0 replacement
parts
32
12.1
overview and valve train assembly
33
13.0 accessories
34
14.0 troubleshooting
35
15.0 warranty
38
16.0 service
history
39
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel
Ltd. reserves the right to change or modify any information within this manual at any time without
notice. Changes, other than editorial are denoted by a vertical line in the margin.
note: