W415-1461 / G / 07.20.20
EN
14
finishing
4.0 finishing
NEFI24H
NEFI27H
Place the log (#1) onto the pin.
Ensure the log is secure onto the
pin, as shown.
Place log (#2) onto the pin. Ensure
the log is secure onto the pin, as
shown.
Place the logs shown on the location
dimples on the burner platform.
Place the logs shown on the location
dimples on the burner platform.
#1
NEFI24H
NEFI27H
#2
PIN
NEFI24H
NEFI27H
#1
PIN
PIN
Place log (#1) onto the pin. Ensure the log
is secure onto the pin, as shown.
4.1 NEFI24H log placement
4.2 NEFI27H log placement
1
3
1
2
2
!
WARNING
• Power supply service must be completed prior to finishing to avoid reconstruction.
• Heat vents and air openings cannot be covered in any circumstances.