17
Cabinet Door Installation
Insert pivot rod (crimped end down) through hole on inside top of door. Holding
door in one hand, direct pivot rod into hole in underside of front panel. Once se-
cure, let rod slide down and through hole in bottom of door and into bushing in
bottom shelf.
10
Ash Tray / Drip Pan Installation
11
Slide drip pan into front of base as shown. Ensure drip pan rides along rails on
bottom of base.
Crimped End