EN
W415-4077 / B / 01.31.23
7
general information
1.3 installation overview
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance.
2. Install rough framing (refer to “rough framing” section).
3. Place the appliance in its final position.
4. Install nailing tabs (refer to “nailing tab installation” section).
5. Install appliance venting (refer to “venting installation” section).
6. Install all electrical wirings (refer to “electrical information” section).
7. Install gas lines (refer to “gas installation” section).
8. Test appliance.
9. Complete framing (refer to “finish framing” section).
10. Finishing (refer to “finishing” section).
10
9
5
4
6
7
3
2
1
8
Safety Barrier
For Universal Heat Management installation steps, refer to the leaflet provided with the Universal Heat
Management kit. Start Universal Heat Management installation before placing appliance in its final position.
note: