background image

Pre-installation set-up 

(To be completed on ground or flat surface)

To begin, align the holes in the mounting tracks 

over the four pre-drilled holes near the center of 

the tent base.

A)

 Remove plastic end caps. Leave off until step 11.

B)

 Slide the 10mm nylon locking nuts into the 

inner slot in the center of the mounting tracks. 

Align with the holes on the base.

1

A) 

Add one steel washer to each 10mm x 40mm 

bolt provided. 

3

B)

 Slide hand between the base and 

mattress (unzip tent for access) to 

insert the bolts (with washers) into 

the pre-drilled holes. They should 

pass through the holes in the tent 

base and the mounting tracks to 

meet the nuts in the mounting track. 

C)

 Reach under the mattress and 

secure bolts firmly with the 10mm 

wrench (supplied).

3

2

2

Reviews: