Pre-installation set-up
(To be completed on ground or flat surface)
To begin, align the holes in the mounting tracks
over the four pre-drilled holes near the center of
the tent base.
A)
Remove plastic end caps. Leave off until step 11.
B)
Slide the 10mm nylon locking nuts into the
inner slot in the center of the mounting tracks.
Align with the holes on the base.
1
A)
Add one steel washer to each 10mm x 40mm
bolt provided.
3
B)
Slide hand between the base and
mattress (unzip tent for access) to
insert the bolts (with washers) into
the pre-drilled holes. They should
pass through the holes in the tent
base and the mounting tracks to
meet the nuts in the mounting track.
C)
Reach under the mattress and
secure bolts firmly with the 10mm
wrench (supplied).
3
2
2