3.  Flush mounting 

Use the multi material backbox provided or an airtight insulated backbox with a 
waterproofing membrane through which the sheath passes. If the backbox passes 
through the sealing plane, seal between the backbox and the partition with a 
specific VOC free and silicone free sealant. If ordering the backbox separately: 

 

Make sure that the backbox doesn’t contain Silicone. 

 

The internal depth of the case must be at least 50mm. 

 

The internal diameter (about 64mm) shall have a 40x40mm space free up to 

the bottom) 

 

The space between screws shall be 60mm 

 

The height of the screws heads shall be 2mm max) 

 

4.  Wiring 

Be careful, wiring must be sealed. Incoming air, even slight, would seriously jam the 
temperature, humidity and air quality measures. 
When the switchboard is located in the heated volume: caulk arrivals between cables 
and ducts at the switchboard level. 
When the switchboard is out of the heated volume, caulk between cables and ducts 
before entering the heated volume. A sealing plug must also be placed between 
duct and cable reaching the EP5000 probe to prevent air entry. 
When the sealing of the duct is not possible, use a specific sealant without silicone 
and VOC. 
In case of use of electrical backbox, select an airtight case with sealing membrane 

from which the duct passes through. If the case crosses through the sealing plane 
(plasterboard), seal between the casing and panel with a special sealant without 
silicone and VOC. 
 
Connectors are specified for rigid cable 18 to 24 AWG (1 to 0.5mm dia.) or 

twisted 20 to 22 AWG (0.8 to 0.65mm dia.) 
The connectors accept two 0.8mm cables on the same terminal in order to chain 
several sensors. Beware of line losses, a 0.8mm cable has a resistance of 21Ω 
per Km. 

 

5.  Installation 

It is recommended to install the probe at the end of the work (after painting and using 
silicone-based products). 
Connect the ModBus and the 24V DC Power Supply pair cables on the terminal 
block on the back of the product. Pay attention to marking: Modbus A & B and 
power supply polarity. 

 

Just push the stripped ends (flexible or rigid) into the connector. In case of a multi-
strand cable, make sure to well twist them before inserting them. In case of 
difficulty, push the release tab. Respect the polarity (non-destructive). 

 

Make sure to respect the Up marking otherwise the temperature and humidity 
measurement will be jammed. 
Screw the plate on the backbox. 
Plug the front panel onto the plate. Pay attention to the position of the connector in 
the back of the front plate. 

 

If well mounted, the transparent window of the light sensor shall be on top middle. 

Ø 67/68 

 

 

Summary of Contents for EP5000M

Page 1: ...levue 92100 Boulogne Billancourt France Tél 33 0 1 41 41 00 02 www nano sense com page 1 6 EP5000M air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update ...

Page 2: ...tallation Guide Modbus E5000 IAQ probe page 2 6 Summary 1 Security 3 2 Positioning 3 3 Flush mounting 5 4 Wiring 5 5 Installation 5 6 Power on 6 7 Connections 6 7 1 Power supply 6 8 NFC 6 9 Disconnection 6 ...

Page 3: ...oltages 2 Positioning The position of the probe is crucial vis à vis efficiency and energy savings for ventilation heating and cooling The probe is designed to ensure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m Avoid drafts near openings blowing air doors outlet vents and dead zones ...

Page 4: ...Installation Guide Modbus E5000 IAQ probe page 4 6 Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Page 5: ...ilicone and VOC In case of use of electrical backbox select an airtight case with sealing membrane from which the duct passes through If the case crosses through the sealing plane plasterboard seal between the casing and panel with a special sealant without silicone and VOC Connectors are specified for rigid cable 18 to 24 AWG 1 to 0 5mm dia or twisted 20 to 22 AWG 0 8 to 0 65mm dia The connectors...

Page 6: ...supply board Red LED on for 5 seconds Followed by a yellow flash 1 Front panel board Followed by 2 yellow flashes 2 Single band CO2 sensor module Followed by 3 yellow flashes 3 Dual band CO2 sensor module Followed by 4 yellow flashes 4 VOC sensor module Followed by 5 yellow flashes 5 Motherboard Followed by 6 yellow flashes 6 Interconnection board Followed by 7 yellow flashes 7 Particle sensor boa...

Reviews: