Installation Guide Modbus E5000 IAQ probe 

 

page 3/6 

 

1.  Security 

 

WARNING

 

Danger of death, risk of electric shock and fire! 
The installation should only be undertaken by a qualified electrician! 
 
To apply for correct  bus  and power cables  and to  activate the device, comply  with  the state of the art 
and standards. 
 
Any intervention or modification to the device will invalidate any warranty claim. 
 
• Do not use this probe in environments with regular exposure to silicon vapors (HMDS) because this 
gradually alters the sensitivity of the VOC sensor.  
• Do not use the sensors for measuring gas content relating to safety! 
• Use the probe only with secured low voltages! 
 

2.  Positioning 

The  position  of  the  probe  is  crucial  vis-à-vis  efficiency  and  energy  savings  for 
ventilation, heating and cooling. 
 
•  The  probe  is  designed  to  ensure  air  quality;  it  must  be  placed  in  the  area  of 
occupancy  of  the  premise  served  by  outlet  vents,  on  a  wall  at  eyes  level 
(breathing human level, between 1.5 and 1.8m). 
 
• Avoid drafts (near openings, blowing air, doors, outlet vents) and dead zones 
(niche, shelves and curtains). 
 
• Avoid orthogonal walls (corners of room in particular) 
 
•  Avoid  heat  sources  and  the  proximity  of  occupants  (radius  of  1  m  from 
workstation). 
 
 
• Position the probe vertically on a wall or partition. 
This device is not intended for installation in duct or ceilings. 
 
• Avoid direct exposure to sunlight. Consider all seasons sun positions  
 
• The positioning must take into account the desired quality of the ambient light measurement. 
 

Summary of Contents for EP5000M

Page 1: ...levue 92100 Boulogne Billancourt France Tél 33 0 1 41 41 00 02 www nano sense com page 1 6 EP5000M air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update ...

Page 2: ...tallation Guide Modbus E5000 IAQ probe page 2 6 Summary 1 Security 3 2 Positioning 3 3 Flush mounting 5 4 Wiring 5 5 Installation 5 6 Power on 6 7 Connections 6 7 1 Power supply 6 8 NFC 6 9 Disconnection 6 ...

Page 3: ...oltages 2 Positioning The position of the probe is crucial vis à vis efficiency and energy savings for ventilation heating and cooling The probe is designed to ensure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m Avoid drafts near openings blowing air doors outlet vents and dead zones ...

Page 4: ...Installation Guide Modbus E5000 IAQ probe page 4 6 Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Page 5: ...ilicone and VOC In case of use of electrical backbox select an airtight case with sealing membrane from which the duct passes through If the case crosses through the sealing plane plasterboard seal between the casing and panel with a special sealant without silicone and VOC Connectors are specified for rigid cable 18 to 24 AWG 1 to 0 5mm dia or twisted 20 to 22 AWG 0 8 to 0 65mm dia The connectors...

Page 6: ...supply board Red LED on for 5 seconds Followed by a yellow flash 1 Front panel board Followed by 2 yellow flashes 2 Single band CO2 sensor module Followed by 3 yellow flashes 3 Dual band CO2 sensor module Followed by 4 yellow flashes 4 VOC sensor module Followed by 5 yellow flashes 5 Motherboard Followed by 6 yellow flashes 6 Interconnection board Followed by 7 yellow flashes 7 Particle sensor boa...

Reviews: