
- 24 -
3.
SET-UP Position & maintenance
V.Adjustment and Inspection
You can find the audit system by opening the main part door.
IC board includes power
fuse
audit and test functions
Please see
1 Link
adjustment
for IC board
function.
Fix position after assembly
1.Hoist the machine from the hoist
point.
2.Keep at least 50cm(20”) space
from the back for maintenance
and to avoid over heating.
Electrical plug display
50CM(20’’)
Attention:
The power must be turned off before any movements.
Check the power rate before use AC110V~120V/AC220V~240V
,
Check Electrical plug display as a guide.
Summary of Contents for PAC-MAN BASKET
Page 1: ......
Page 36: ...36 VIII Wires Layout Basketball Wire diagram...
Page 37: ...37...
Page 45: ...45...