![Nakanishi AL-M1203BS2 Operation Manual Download Page 8](http://html.mh-extra.com/html/nakanishi/al-m1203bs2/al-m1203bs2_operation-manual_704435008.webp)
17
6
. INSTALLATION AND CONNECTION OF THE AIR LINE KIT
CAUTION
The Air Line Kit must be install horizontally on a vertical surface.
English
(1) Connect the Connection Hose (Standard Accessory) to the Primary Joint of the Air Line Kit.
(2) Connect the Filter Joint of the air motor to the
ȭ
6 One - Touch Joint of the Secondary Joint of the Air Line Kit.
(3) Connect the DC+24V power source voltage to the electric wire of the Solenoid Operated Valve and Alarm
Buzzer.
Fig. 7
Solenoid Operated Valve
Supply Air / Oil Hose
Exhaust Air / Oil Hose
Red (
+
)
Black ( - )
Connection Hose
Primary Joint
Connector for Air Hose
DC+24V
Red (
+
)
Black ( - )
Red (
+
)
White ( - )
DC+24V
DC+24V
ȭ
6 Filter Joint
Air Motor
Spindle
ȭ
6 One - Touch Joint
6 - 1 Installation of the Air Line Kit
6 - 2 Connection of the Air Line Kit
Mount it to the vertical wall on horizontal attitude.
Because the head of the mounting screw
is sticking out from the Base Plate, Use the
Hexagon Socket Bolts and Spacers (Standard
Accessories : 4pcs. Each) when mounting.
Spacer
Base Plate
Hexagon Socket Bolt (M8
×
20L)
Mounting Screw
Installation Surface
Wall
Fig. 6