2
Table of Contents
Congratulations
3
Warranty
4
About your PL–L
5
Basic Operations
6
Connecting the PL-L ACPS AC Power Supply
7
Vacuum Tube Identification and Location
8
Remote Control
10
Tube, Jumpers and timer positions
12
Burn–in Period
12
Left Panel/Input Layout
13
Front Panel/Control Layout
13
Right Panel/Output Layout
15
Advanced Operations
17
Modulometer Calibration and its use
18
Output level attenuation
19
Hum
20
Specifications
23
Safety/Compliance
24
Table of Contents