background image

1.Read this manual carefully and completely before proceeding.

2.It is recommended that you wear safety glasses at all times during the installation

ƽ

IMPORTANT  /  IMPORTANT

3.Prior to installation of base, all framing and plumbing work must be completed in accordance with this
instruction sheet.For renovation work, existing shower surfaces must be removed to accommodate
framing requirements. Ensure that outer wall are properly insulated, and that a vapor barrier has been
installed in accordance with established building codes.

In order to protect the acrylic surface of your base, never use scouring powder pads or other strong
solvent. Only clean with a mild detergent diluted in water or a detergent formulated speci

fically for

acrylic.

* Lisez attentivement ce manuel au complet avant de continuer.

*  Il est recommandé de porter des lunettes de sécurité en tout temps lors de l'installation

* Avant l'installation de la base, toute la charpente et les travaux de plomberie doivent être complétés
conformément à la présente feuille d'instruction. Pour les travaux de rénovation, les surfaces murales
existantes doivent être enlevées pour installer le cadrage exigé. Assurez-vous que les murs extérieurs
sont isolés correctement  et que le pare-vapeur a été installé conformément aux codes du bâtiment.

ƽ

 Care for your Acrylic Shower Base / Prenez soin de votre Base de douche en acrylique

Afin de protéger la surface en acrylique de votre base, ne jamais utiliser de tampons à récurer avec
poudre ou tout autre solvant fort. Nettoyez avec un détergent doux dilué dans de l'eau ou un détergent
formulé spécifiquement pour l'acrylique.

OUTILS ET MATÉRIAUX REQUIS / TOOLS AND MATERIALS REQUIRED

 

PERCEUSE 

DRILL

SILICONE
SILICONE

COUTEAU DE PRECISION 

PRECISION KNIFE

RUBAN À MESURER

MEASURING TAPE

MAILLET

MALLET

NIVEAU

LEVEL

TOURNEVIS

SCREWDR

CRAYON

PENCIL

ÉQUERRE

SET SQUARE

MORTIER 

MORTAR

TRUELLE 

TROWEL

CALE 

SHIM

ESSUIE-TOUT 

TOWELS

FORETS: 1/8" 

 DRILL BITS: 1/8"

2

Summary of Contents for BS-RT3660W3

Page 1: ...8 30mm 2 3 4 70mm 60 1524mm 17 440mm 4 9 16 116mm 3 35 64 90mm 30 762mm 2 1 2 65mm 1 25mm This indentation is designed to ensure the water goes back to the shower base towards the drain Cette fente es...

Page 2: ...lors de l installation Avant l installation de la base toute la charpente et les travaux de plomberie doivent tre compl t s conform ment la pr sente feuille d instruction Pour les travaux de r novatio...

Page 3: ...A B C D 90 A 02 C 90 D Enlever la p llicule de plastique protectrice Remove protective plastic film A 01 BASE INSTALLATION INSTALLATION BASE SUITE CONTINUED 3 A 03...

Page 4: ...SUITE CONTINUED FORET 1 8 1 8 DRILL BIT A 05 A 04 SUITE CONTINUED 4...

Page 5: ...GH FlUDPLTXH HUDPLF WLOHV SVH SVLXP 6LOLFRQH 0RQWDQW PXUDO DOO VWXG 9LV 5 HI 6FUHZ 5HI VUE SECTIONNELLE SIDE SECTION VIEW A 07 Pellicule Film Base Base Mor er Mortar A 06 9LV 6FUHZ SUITE CONTINUED SU...

Page 6: ...er votre porte de douche afin de permettre au mortier et la finition de s cher compl tement WARNING Wait 24h before proceeding with the installa tion of the shower door This will ensure that the finis...

Page 7: ...cune indemnit ne pourra tre r clam e suite la perte de jouissance de la vie la perte de revenu ou aux pertes caus es par l eau S il y a des d fauts de fabrication couverts par cette garantie Bain D p...

Page 8: ...the repairs or replacement of the product of it s systems and or any of its components There shall be no possibilities of claiming any indemnity following the loss of life the loss of income or losses...

Reviews: