
For example; all 7 channels at 50W/4 ohms for 10 minutes or 5 minutes or even less (as
long as the fan can starts turning). Turn off the signal but still keep the unit operating for 1
minute. Then run all 7 channels at 1kHz,
0.25W
at 4 ohms load, monitor the voltage at
TP1 J201. Adjust RV201 to get the voltage from negative to positive to ensure
that the Fans are turned off. Then run all 7 channels at 1kHz,
0.5W
at 4 ohms
load, monitor if the voltage at TP1 of J201 is negative, if not, adjust Pot RV201 just
to the point that TP1 changes from positive to negative (to get the fans just start turning).
Finally, turn off the signal and monitor if fans stop turning within about 30s Maximum.
- 6 -
Summary of Contents for T 975 C/AH
Page 21: ...T975 POWER LED BOARD POWER LED BOARD VM1 0 2006 05 18 D701 P701A 1 21 PCB LAYOUT...
Page 22: ...T975 SWITCH BOARD SWITCH BOARD VM1 0 2006 05 18 1 P801A S801 1 22 PCB LAYOUT...
Page 23: ...TP BOARD TP901 901 T975 TP BOARD VM1 0 2006 05 18 TP902 TP904 TP903 23 PCB LAYOUT...
Page 40: ...40 PACKING DIAGRAM...