Exposed Shower Installation
1. 15mm diameter
pipework should be installed and flushed before commencing installation.
Ensure distance of inlet pipe centres is 150 mm and that they protrude 20mm from the wall surface and that
the wall bracket is central. Adjust if required.
2. Place valve body against wall with elbows over pipe ends. Mark position of valve body on wall. Remove valve
body, place wall bracket in centre of marked position and mark position for fixing holes.
See Fig 1.
Note: the centre distance of two elbow is adjustable, the adjustment dimension is 145-155mm. You can
adjust the centre distance of the elbow ( screw the two elbows clockwise / anticlockwise) as required.
3. See Safety Note.
Important - Use appropriate fixings suitable for wall type/construction.
Drill holes to
suit required fixings (Use wall plugs supplied as required).
4. Secure wall bracket to the wall using the wall screws supplied.
5. Fit the flange, fixing nuts and copper olives over the inlet pipes.
6. Insert the filters into the elbows.
7. Make sure that the elbows align with the inlet pipes, push valve body to the wall bracket and pipes with the
outlet to the bottom and secure with the two grub screws supplied using a 2.5mm hexagonal key at the same
time. See Fig 2.
Carefully tighten securely the nuts of the elbows using a spanner (not supplied). See Fig 2.
8. Fit Lever to the on/off and flow control handle..
9. Turn on both water supplies and check for leaks.
Inlet pipes (not supplied)
150±1 mm
20mm
Valve body
Grub screw
Copper olives
Fixing nuts
Wall screw
Hexagonal
key
Wall plug
Flange
Wall bracket
Filter
Lever
Fig 2
150±1 mm
Fig 1
The position of
valve body.
Temperature
control handle
On/off and flow
control handle
Elbows