Rev. 9-24-14
Part #15-10683
GT 710-8710 Swing Door System Low Energy Operator
Install the First Half of Swing Arm
5-15
7.►
Cut the Plastic Tube to the same length as the exposed Rod (between the Links and Nuts).
8.►
Slide the Plastic Tube over the Threaded Rod.
9.►
Replace the Rod Link back onto the Threaded Rod.
10.►
Tighten the Nut against the Link to prevent the Rod from screwing In or Out.
DN 1097
Arm
Shoe
Sex Bolt
Threaded Rod
1/4-20 x 2-1/4”
Phillips Head Screw
Swing Door
Color Coordinated Sleeve
Figure 5-5
Secure Arm Shoe to the Swing Door
5.a.c: Secure the Arm Shoe to the Swing Door
1.►Butt the Arm Shoe against the Swing door. Align the first Sex Bolt hole to the measured Mark. Please
see
2.►
Ensure the Arm Shoe is square and level.
3.►
Use the Arm Shoe as a Template to mark the second Sex Bolt hole. Set aside.
4.►
Drill (2) 3/8 inch bolt holes all the way through the Swing door.
5.►
Go to the back of the Swing door. Insert each Sex Bolt into the drilled holes.
6.►
Go to the front of the Swing door. Secure the Arm Shoe to the Swing Door with (2) 1/4-20 x 2-1/4”
Screws.
Section 5 b:
Inswing Arm
DN 1082
Face of Swing Door
Back of Header
= Reveal
Reveal
Figure 5-6
What is Reveal?
5.b.a:
Prep the Swing Door
Note: Ensure there is a 2 inch gap between the wall and the outside face of the Swing door in the fully
opened position (90
degrees
).
1.►
Go to
to measure the distance from the inside edge of the Pivot Door Jamb,
or the Center Pivot to the center of the first Sex Bolt hole (used to attach the Track).