Assembly Instructions
Step 1
•
Connect the top
connection tube
(Part C and Part
D), fasten them by
bolts (Part Q),
nuts (Part V) and
washers (Part W).
Put the plastic
cap(Part Z) on
the bolts.
Step 2
•
Connect the leg
tube (Part A and
Part B) with top
connection tube
(Part C and
Part D), fasten
them by bolts
(Part U), nuts
(Part V) and
washers (Part W).
Put the plastic
cap(Part Z) on
the bolts.
Note: All Bolt Head Caps and Nut Caps should not be attached before finally
tightening all Bolts with the Allen Key.
Only tighten all bolts when you are satisfied with the alignment of all components.
Summary of Contents for WT287
Page 3: ...Exploded View...
Page 12: ...Manchester M60 6ES...