background image

12

ECO-15 PARTS & PRICING

1

2

3

4

5

7

8

9

10

11

12

13

14

15

16

17

18

19

6

20

21

22

24

23

25

26

27

28

29

30

32

33

34

22

36

22

39

38

40

41

42

43

47

6

48

49

18

16

50

1

2

86

77

78

87

7

88

77

54

24

58

63

74

76

79

65

85

80

81

82

83

84

98

99

88

100

101

97

102

103

104

105

41

41

106

107

108

109

110

84

112

114

115

116

89

90

91

92

93

94

71

95

96

95

84

6

11

37

59

60

61

11

34

6

6

22

31

35

113

111

34

46

24

45

44

53

11

52

51

55

56

75

56

64

66

68

69

70

71

73

62

24

72

60

65

57

45

45

67

D

C

B

A

A

B

C

D

1

2

3

4

5

6

7

8

8

7

6

5

4

3

2

1

E

F

E

F

ECO-15

SHEET 2 OF 3

Encap

SCALE: 1:24

REV

DWG.  NO.

D

SIZE

TITLE:

NAME

DATE

CHECKED

DRAWN

PROPRIETARY AND CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF MYTEE PRODUCTS, INC.  ANY  REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF MYTEE PRODUCTS, INC. IS PROHIBITED.

mytee

 

PRODUCTS, INC.

858-679-1191

M. LaBarbera

3/2015

OD

DO NOT SCALE     DRAWING

Summary of Contents for eco-15

Page 1: ...rm ADM ECO17 2 17 Please read before use Register your product at http www mytee com support register General Information p 2 Unboxing Assembly p 4 Set Up Operation p 5 Flywheel Bearing Replacement p...

Page 2: ...ial Number of your machine for future reference Unpacking the Machine When the machine is delivered carefully inspect the shipping cartons and the machine for damage If damage is evident save the ship...

Page 3: ...machine with a clean soft damp cloth 3 Store in a clean dry place with a pad attached to protect the pad driver 4 Do not expose to rain Store indoors Maintenance Schedule Maintenance item Daily Once a...

Page 4: ...he base of the handle to the motor 1 Set the handle assembly in place and bolt it in using the two included bolts Thread the bolts in by hand as far as you can in order to prevent stripping of the thr...

Page 5: ...5 ECO 17 SETUP OPERATION SHAMPOO TANK HEIGHT ADJUSTMENT LEVER The handle can be adjusted to any desired working posi tion by simply squeezing the adjustment lever Move the handle to the desired positi...

Page 6: ...ng the pad driver The pad driver is attached with four bolts highlighted above To use a pad simply lay the pad on the floor and lower the machine with the pad driver onto the pad Try to center the pad...

Page 7: ...TION To effectively clean floors move the Orbital Floor Machine forwards and backwards similar to using a household vacuum cleaner Wet the floor by spraying solution as you roll the unit forwards ECO...

Page 8: ...ETUP OPERATION USING THE ECO 15 ECO 17 ON VARIOUS SURFACES CARPET TILE GROUT EPOXY VINYL STONE WOOD CONCRETE MORE IMPORTANT Ensure that you are using the appropriate pad type depending on the surface...

Page 9: ...aring assembly Clean the Allen bolts and coat the first 4 threads with Blue Loctite 5 Install the new bearing assembly using the Allen bolts removed in Step 4 Orient the bearing against the flywheel p...

Page 10: ...ssure the flywheel coun terweight clears the motor bolt heads 9 By hand turn the bearing to assure it rotates smoothly and freely 10 Install the pad driver using the bolts removed in Step 1 Clean then...

Page 11: ...1 8 mpt x 1 8 mpt 2 1 99 ea 61 B656C valve ball 1 8 fpt x 1 8 fpt s s 1 10 99 ea 62 PH657 17 tubing 1 4 nylon blk 1 1 99 ft ITEM NO PART NO DESCRIPTION QTY MSRP 63 PH634 12 sol hose 1 4 silicone braid...

Page 12: ...61 11 34 6 6 22 31 35 113 111 34 46 24 45 44 53 11 52 51 55 56 75 56 64 66 68 69 70 71 73 62 24 72 60 65 57 45 45 67 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 E F E F ECO 15 SHEET 2 OF 3 Encap...

Page 13: ...ART NO DESCRIPTION QTY MSRP 63 PH634 12 sol hose 1 4 silicone braided clear 1 6 49 ft 64 B170 ferrule 1 4 brass 4 0 99 ea 65 B136 elbow brass 90 deg 1 4 mpt x 1 4 mpt 2 4 99 ea 66 B105 bushing brass 3...

Page 14: ...1 59 60 61 31 22 6 11 32 69 68 52 70 71 72 73 60 24 74 41 40 38 37 39 24 66 65 64 56 63 35 110 2 112 53 11 11 54 55 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 E F E F ECO 17 SHEET 2 OF 3 Encap SC...

Page 15: ...15 ECO 15 ECO 17 WIRING DIAGRAM Orbital Machine Wire Schematic L1 L2 G Rev 10 16 2016 Pump G To Metal Plate Motor G E 515...

Page 16: ...16 Mytee Products Inc 13655 Stowe Dr Poway CA 92064 www mytee com 2017 Mytee Products Inc Printed in the U S A NOTES...

Reviews: