Page 8
INSTALLATION PROCESS
A—BASE PLATES INSTALLATION
Please refer to the below diagram to mark the position of base plates
The measurement is from center to center of base plates. Referring to the diagram and confirm the
place of base plates. ENSURE THAT THE FOUNDATION IS SQUARE.
Note: The expansion bolt (No.17) applies for fixing base plate on concrete ground.
B—FRAME INSTALLATION
First Arch and Front Wall Installation
1. Find Trusses (No.1A, 2A, 3A, 4A and 4C) for first arch and connect them by hex bolt M8x70
(No.18).