7.0  Water Connections

G

Connect unit to system flow and return pipes using the two 

5

/

8

" isolating valves (see fig. 2). 

G

Ensure system is flushed in accordance with recognised best 
practice and a suitable inhibitor is added to the system as
necessary.

G

Open valves fully, check pipe connections for leaks and vent 
the heat exchanger - see Commissioning Procedure.

Note:

To ensure effective venting of the heat exchanger the flow

pipe should be connected to the bottom connection of the heat 
exchanger.

Note:

For SLIM-LINE RC installations pipe-work must not be

routed directly underneath the unit as this will adversely affect
the operation of the integral room thermostat. 

If this cannot be

avoided, the pipe-work must be boxed to prevent heat rise.

5.0

6.0

7.0

6

11/16

1

3/4

1

3/8

6

6

7/8

3

1/4

14

3/16

31

5/16

1

3/4

Fig. 2

21924 Slimline RC Manual - US:Layout 1  17/7/09  09:31  Page 6

Summary of Contents for SLIM-LINE RC

Page 1: ...ating Maintenance and After Sales Manual Product Serial Number Please leave this manual with the end user Part Number 1371057 Issue 1 heatingthroughinnovation SLIM LINE RC 01 07 2009 ISSUE 1 Tested to...

Page 2: ...t Selection Sizing 03 4 0 Location 03 5 0 Preparation 04 6 0 Fixing 04 7 0 Water Connections 05 8 0 Electrical Connection 06 9 0 Commissioning Procedure 07 10 0 Technical Data 08 11 0 Operating Instru...

Page 3: ...means that 1 Care must be taken in sizing both the pump and piping 2 The minimum pipe size from boiler to fan convector must be at least 1 2 3 Where the unit is fitted on to a system with other emitte...

Page 4: ...ole positions on the wall G Drill and plug the wall for No 8 x 11 2 round head wood screws ensuring that the wall plugs are suitable for the wall type G Remove the backing from the self adhesive washe...

Page 5: ...leaks and vent the heat exchanger see Commissioning Procedure Note To ensure effective venting of the heat exchanger the flow pipe should be connected to the bottom connection of the heat exchanger No...

Page 6: ...onnector G Connect supply to terminal block provided as per the wiring diagram below 8 0 Electrical Connection WARNING This appliance must be grounded The electrical installation must comply with stat...

Page 7: ...set point can be adjusted using the set point switch located on the control board G Isolate electrical supply G Remove outer cover G Change switch position see fig 3 G Refit cover G Switch on electric...

Page 8: ...tu h Entering Water Temperature F entering air temperature 65 F 1 3 186 127 97 186 127 97 Boost Medium Normal Boost Medium Normal 110 120 130 140 150 160 170 180 190 200 Heating Performance Data Air F...

Page 9: ...e in the unit This means that air circulation can be provided in summer for example or that heating performance can be controlled manually The unit can be controlled using the infra red remote control...

Page 10: ...re pressed the horizontal bars will reappear to show the key lock mode is activated however during this mode the handset controls remain functional To unlock the system press the On Off button for abo...

Page 11: ...on Increase temperature set point Switch on at breaker Check all wiring and reset breaker Open valves Check boiler Programmer ON Boiler ON and set to high with central heating pump running Note Opera...

Page 12: ...East Yorkshire HU9 5PE T 01482 713927 F 01482 789056 service convectors myson co uk Spare parts and technical help on all Convector products are available from MYSON Service MYSON INC 49 Hercules Dri...

Reviews: