18
19
the center of the C-clip
to flatten it, and slide the
clip underneath the man-
ual switch
until the clip
locks in place (Fig. 2.3).
NOTE
HARDWARE PLACEMENT:
For the following instal-
lation instructions, refer to Figures 2.4 and 2.5
to determine the best hardware placement and
installation method for your set of blinds. Spread
out the hardware as much as your headrail will
allow in order to avoid kinking the cables.
Fig. 2.4
Fig. 2.5
Fig. 2.3
4. Lay the battery pack
(E)
inside the headrail so that
the cable is on the top
left side (Fig. 2.6). If your
headrail has more than
two barrels, place the bat-
tery two bays away from
the manual switch
(D)
.
5. Connect the battery pack
(E)
cable to the white
connector on the motor
box’s
(A)
right side (Fig
2.7).
6. Connect the manual
switch
(D)
cable to the
gray connector on the
motor box’s left side (Fig.
2.8).
Fig. 2.6
Fig. 2.7
Fig. 2.8