background image

4/4

OPERATION / TESTING / MAINTENANCE

OPERATION

When AC power is applied, the LED test switch is illuminated, indicating that the batteries are being charged. When 
AC power fails, the LVU-2/5 automatically switches to emergency power, operating the LED loads at rated power. 
The LED test switch is switched off. When the AC power is restored the emergency module switches the system 
back to normal mode and resumes battery charging. The minimum emergency operation time is 90 minutes. The 
charging time for the fully discharged battery is 24 Hours.

TESTING AND MAINTENANCE

Following periodical tests are recommended to ensure the system is working well:

1. Visually inspect the LED test switch(LTS) monthly. It should be illuminated when AC power is applied.
2. Conduct a 30 seconds discharge test by switching off the mains power every month. The LTS is switched off .
3. Conduct a 90 minutes discharge test once a year. 

AUTO TEST

The LVU-2/5 series has Auto Test function which save the cost of

 

manually maintenance.

1. Instant Auto Test 
    When the system is connected and powered on, the LVU-2/5 model will Auto Test if the load and battery 
    pack are connected properly and if the battery is being charged normally. If there is any abnormal situation, the 
    LTS will flicker. When the abnormity is removed, the LTS indicates normally. 
2. Preprogrammed scheduled Auto Test 
1) Carry out first monthly Auto Test after Initial power on from 24 hours to 7 days, afterwards, carry out a 
    monthly Auto Test every 30 days. 
2) Carry out an annual Auto Test every 52 weeks after first powered on. 
3) Monthly Auto Test 
    Monthly Auto Test should be executed every 30 days and to test: 
    If the switchover of normal and emergency mode is normal;
    If the emergency function and battery's charging and discharging condition is normal;
    Auto Test time is about 30 seconds. 
4) Annual Auto Test 
    Annual Auto Test will be executed every 52 weeks after 24 hours full charging and to test: 
    If the battery's voltage is equal or higher than the limit after 24 hours full charging; 
    If the emergency operation time is over 90 minutes; 
    If the battery voltage after 90 minutes emergency operation is equal or higher than 87.5% of the

 

initial

 

voltage. 

5) During the Auto Test, in case a power failure happens and the power cannot be on till the Auto Test completes, 
    then the Auto Test will be executed again 24 hours later after the power is on. 
6) If the emergency mode makes the battery discharged completely under the power off condition, then the 
    preprogrammed scheduled Auto Test will resume the first time when the power is connected. 

MANUAL TEST 

 - Press LTS one time, the unit will transfer into emergency mode. 
 - Press LTS 2 times continuously within 5 seconds, the unit will enter monthly test. When complete, the next monthly 
   test will start counting from this date. 
 - Press LTS 3 times continuously within 5 seconds, the unit will enter on annual test, when complete, the next annual 
   test will start counting from this date. 
 - During the manual test, press LTS greater than 3 seconds, and the manual test will terminate (The preprogrammed 
   scheduled Auto Test time will not change). 

 

LED test switch(LTS) INDICATION 

 - LTS

 

slow flash: In charging 

 

 - LTS on: Battery fully charged (normal operation)
 - LTS off: Power failure 
 - LTS gradual change: In testing 
 - LTS quick flickering: Abnormal

WWW.MYERSEPS.COM

Summary of Contents for LVU-2

Page 1: ...al power emergency power unit and connector of this product before servicing 5 For emergency operation of LED incandescent fluorescent and screw base lamps 6 Use this product in 0 C minimum 50 C maximum ambient temperatures Ta To ensure the emergency operating time over 90 minutes the output emergency power of LVU 2 5 should be maximum of 25W for the LVU 2 and 50W for the LVU 5 7 Use with grounded ...

Page 2: ...TS Select a convenient location for the LTS so that it can be seen after installation Drill a 1 2 12 mm hole for mounting the LTS Connect the wires from LTS to the LVU 2 5 model according to the wiring diagram on page 3 INSIDE THE LUMINAIRE LVU 2 5 LED test switch CAUTION MAKE CERTAIN THE AC POWER IS OFF AND THE LVU 2 5 UNIT CONNECTOR IS DISCONNECTED UNTIL THE INSTALLATION IS COMPLETE LVU 2 LVU 5 ...

Page 3: ...ORESCENT INCANDESCENT LUMINAIRE DIM IN BLUE WHITE DIM IN BLUE RED 0 10V DIMMER GRAY OUT NEUTRAL VIOLET VIOLET UNIT CONNECTOR WIRING DIAGRAM FOR 1 10V DIMMABLE EMERGENCY LIGHTING SYSTEM LVU 2 5 TOTAL DIMMABLE POWER LVU 2 UP TO 175W WHITE RED BLACK YELLOW GREEN WHITE BLACK ANY QUANTITY DIM OUT BLUE DIM OUT BROWN ORANGE OUT HOT NEUTRAL GROUND SWITCH HOT LED Test Switch 120 277 VAC 120 277 VAC LED FLU...

Page 4: ...ed on 3 Monthly Auto Test Monthly Auto Test should be executed every 30 days and to test If the switchover of normal and emergency mode is normal If the emergency function and battery s charging and discharging condition is normal Auto Test time is about 30 seconds 4 Annual Auto Test Annual Auto Test will be executed every 52 weeks after 24 hours full charging and to test If the battery s voltage ...

Reviews: